A kind of recycled rubber asphalt mixture and preparation method thereof
A technology for asphalt mixture and reclaimed rubber, which is used in building thermal insulation materials, building components, buildings, etc., can solve the problems of poor low temperature resistance of reclaimed asphalt mixture, reduced rutting resistance of reclaimed asphalt, and difficulty in fully dispersing rubber oil. , to achieve the effect of improving bonding performance, improving low temperature performance, improving thermal stability and water stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] A preparation method for recycled rubber asphalt mixture, comprising the steps of:
[0033] S1: Weigh 10 parts of rubber oil and 80 parts of rubber powder by weight, add the rubber powder to the rubber oil and swell for more than 6 hours at a temperature of 20°C to obtain a mixture;
[0034] S2: Add 80 parts by weight of new aggregate in the container for mixing, then add the mixture in step S1, then add 20 parts by weight of road surface reclaimed material, 4 parts of matrix rock asphalt, 1.7 parts of 70# asphalt, and then add Add 6 parts of filler to obtain recycled rubber asphalt mixture; the new aggregate includes 30 parts of coarse aggregate and 20 parts of fine aggregate; the content of asphalt in matrix rock asphalt is 22%.
Embodiment 2
[0036] A preparation method for recycled rubber asphalt mixture, comprising the steps of:
[0037] S1: Weigh 20 parts of rubber oil and 70 parts of rubber powder by weight, add the rubber powder to the rubber oil and swell for more than 6 hours at a temperature of 30°C to obtain a mixture;
[0038] S2: Add 70 parts by weight of new aggregate in the container for mixing, then add the mixture in step S1, then add 30 parts by weight of road surface reclaimed material, 7 parts of matrix rock asphalt, 2.2 parts of 70# asphalt, filler 9 parts to obtain recycled rubber asphalt mixture; wherein the new aggregate includes 35 parts of coarse aggregate and 23 parts of fine aggregate; wherein the content of asphalt in the matrix rock asphalt is 26%
Embodiment 3
[0040] A preparation method for recycled rubber asphalt mixture, comprising the steps of:
[0041] S1: Weigh 30 parts of rubber oil and 60 parts of rubber powder by weight, add the rubber powder to the rubber oil and swell for more than 6 hours at a temperature of 40°C to obtain a mixture;
[0042]S2: Add 60 parts by weight of new aggregate in the container for mixing, then add the mixture in step S1, then add 40 parts by weight of road surface reclaimed material, 10 parts of matrix rock asphalt, 2.8 parts of 70# asphalt, filler 12 parts were obtained as recycled rubber asphalt mixture; the new aggregate included 40 parts of coarse aggregate and 26 parts of fine aggregate; the content of asphalt in matrix rock asphalt was 30%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com