Hidden automatic lifting trash holding and overhauling system for water inlet of flood drainage project
An automatic lifting and water inlet technology, which is applied in waterway systems, sewage discharge, artificial waterways, etc., can solve problems such as water inlet blockage and siltation, high safety risks, and abrupt parts of buildings exposed to the water surface, so as to reduce load and save engineering The effect of investing and reducing your own weight
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Such as Figure 1 ~ Figure 5 As shown, the present invention is a concealed automatic lifting trash trash maintenance system for the water intake of a waterlogging drainage project, which is mainly composed of a shaft type water intake 1, a pontoon type gate 2, a vertical stainless steel trash rack 3, a horizontal stainless steel trash rack 4. Comprised of room 5 and maintenance channel 6.
[0023] The vertical water inlet 1 is an entrance for flood discharge, and its size is determined according to hydraulic calculations, followed by a drainage tunnel 7. The elevation of the top of the inlet 1 is generally set to be 0.5m-1m lower than the normal water level, and no buildings are arranged on the upper part to ensure that the original landscape effect is not affected during the drainage period.
[0024] The floating box gate 2 is composed of a stainless steel floating box 2a, a concrete slot 2b, a hydraulic pushing mechanism 2c, and an equipment room 2d. The concrete slot 2...