Tunnel construction method for crossing karst water-rich section

A technology for tunnel construction and water enrichment, applied in tunnels, tunnel lining, drainage, etc., can solve problems such as failure to make full use of tunnel main holes, increase investment costs, and complex processes, so as to reduce blasting construction workload and investment costs. , the effect of speeding up the construction process

Inactive Publication Date: 2020-05-29
SOUTHWEST JIAOTONG UNIV
View PDF17 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Chinese invention patent CN109578007A discloses a construction method for excavation and drainage of tunnels crossing high-angle thrusting water-rich sand-rich faults. A circuitous pilot pit and a high-level drainage tunnel are set on the same side of the main tunnel as the construction tunnel, and the water is discharged through the high-level drainage tunnel. Although this method can discharge the water in the fault to a large extent, in addition to the construction of the main tunnel, it is necessary to build a roundabout pilot pit and a drainage tunnel, which will greatly disturb the surrounding rock in the area and increase the investment cost. Extend the construction period
Chinese invention

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel construction method for crossing karst water-rich section
  • Tunnel construction method for crossing karst water-rich section
  • Tunnel construction method for crossing karst water-rich section

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings of the present invention.

[0035] Such as figure 1 As shown, the tunnel construction method disclosed by the present invention through the karst water-rich section includes the following steps:

[0036] 1) When the tunnel construction is approaching the karst water-rich section, the advanced geological prediction method is used to predict the development of groundwater and stratum information; if it is confused, the TSP203 geological detector is used to detect the surrounding rock within 100m to 200m in front of the tunnel face.

[0037] 2) Advanced horizontal drilling is used to detect the basic conditions of the water inflow position, water inflow volume, and water inflow pressure in the karst water-rich section through shallow water exploration hole 1 and deep ho...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
Drilling depthaaaaaaaaaa
Diameteraaaaaaaaaa
Login to view more

Abstract

The invention relates to a tunnel construction method for crossing a karst water-rich section. The method is characterized by comprising the following steps of: step 1, when the tunnel construction isclose to the karst water-rich section, predicting the underground water development condition and stratum information by adopting an advanced geological prediction method; step 2, drilling a water detecting hole by adopting advanced horizontal hole drilling, and detecting the water inrush position, the water inrush amount and the water inrush pressure of the karst water-rich section through the water detecting hole; step 3, digging a tunnel face leading guide pit in the contour line of a tunnel according to the predicted water inrush position for drainage and pressure reduction, wherein the water inrush position is located on the side wall of the leading guide pit; step 4, grouting by adopting an advanced small conduit, carrying out advanced support on the tunnel to form a grouting ring for water isolation, and preventing underground water from flowing into surrounding rock in front of a tunnel face; and 5, excavating a tunnel body, plugging the water detecting hole, and excavating the tunnel body by controlled blasting. According to the tunnel construction method, the risk of water inrush on the tunnel face can be effectively reduced, and the tunnel construction safety is guaranteed.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a tunnel construction method for crossing karst water-rich sections. Background technique [0002] With the rapid development of the national economy and the urgent needs of the people for the development of transportation, the road and railway-based transportation methods in China have developed rapidly, and the number of tunnel projects built in karst water-rich areas with extremely complex topography and geology is increasing day by day. The groundwater existing in the formation is one of the important factors that generate tunnel construction risks and cause construction accidents. At present, many engineering examples show that in the mountains of karst areas, the groundwater often has high water pressure. If the tunnel construction cannot be discovered in time and appropriate drainage and pressure reduction measures are taken, it is very easy to burst mud and wa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/00E21D11/10E21F16/02
CPCE21D9/003E21D9/006E21D11/10E21F16/02
Inventor 张志强谭因军陶伟明陈昕卿伟宸张磊
Owner SOUTHWEST JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products