Project cost control system based on BIM technology
A technology of engineering cost and control system, applied in the field of building information model, can solve the problems of time-consuming and labor-intensive, cumbersome methods and procedures, low accuracy rate, etc., and achieve the effect of saving construction time, avoiding disputes and saving costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] See figure 1 , is the method flowchart of the engineering cost control system based on BIM technology of the present invention, as shown in the figure, the engineering cost control system based on BIM technology may include the following steps:
[0049] Step S1: Use the human-computer interaction module to log in to the system; specifically, the human-computer interaction module is used for user login, input customer demand data and control command data, preferably, in this embodiment, the human-computer interaction The module can be a computer.
[0050]Step S2: Input the demand command to obtain the project cost documents related to the construction cost; specifically, extract the project cost documents related to the construction cost in the project bidding documents, project list and construction drawings, wherein the project list can include list codes and project name lists , engineering quantities, units of measurement, and feature descriptions of engineering com...
Embodiment 2
[0061] See figure 1 , and with see figure 2 , is another embodiment of the present invention. The difference between this embodiment and the previous embodiment is that the project cost control system based on BIM technology may also include step S8: optimize the construction schedule, and check the construction schedule on site Carry out real-time monitoring and early warning; to avoid affecting the completion progress of the entire project and increasing the cost due to the current slow construction progress.
[0062] Please continue to see figure 2 , the step S8 may include:
[0063] Step S81: Obtain the real-time spatial position of the current construction section in the construction scene; specifically, the real-time space of the current construction section can be positioned in real time or periodically through the differential positioning technology of Beidou and GPS positioning sensors or the acquired construction section image The location can also locate the re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com