Novel suction anchor pile prefabricating and shipping process
A suction anchor and new technology, applied in the direction of ships, etc., can solve the problems of waste of resources, high operation risks, and difficulty in precision control.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary and are intended to explain the present invention and should not be construed as limiting the present invention.
[0035] Such as Figure 1 to Figure 9 As shown, a new process for prefabricated loading of suction anchor piles includes the following steps:
[0036] S100. Carry out complete blanking of the prefabricated suction anchor piles and then cut them into segments, respectively roll the segmented materials into material distribution pipe sections 1 according to the pipe coiler, and add shape-preserving tooling 2 to each material distribution pipe section 1;
[0037] S200, hoisting the material distribution pipe section 1 to the dock 10...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com