Seedling raising yard of hard-base permeable seedling bed
A seedling bed and hard foundation technology, applied in the field of seedling raising, can solve the problems of poor adaptability to the field environment for seedling transplanting, unfavorable for seedlings to turn green in time, and many times of water spraying, etc., which is beneficial to accurate seedling fetching operations and saves seedling management. Water consumption, the effect of facilitating drainage and irrigation management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037]A seedling-raising workshop of a hard-based permeable seedling bed, which includes a seedling bed 2, an inlet channel 3 and a drainage channel 9, and the seedling bed 2 includes a water-permeable layer and a hard foundation 16 formed after flattening and compacting, and the water-permeable layer is laid On the hard foundation 16, the permeable layer is made up of a fine gravel layer 15 and a fine sand layer 14, and the fine sand layer 14 is laid above the fine gravel layer 15; the thickness of the fine gravel layer 15 is 20-60mm, and the fine sand layer The thickness of 14 is 10-30mm; Seedbed 2 is provided with enclosing ridge 7 around, and seedling bed 2 is arranged side by side in many blocks, and the width dimension of multi-block seedling bed 2 is consistent, and the ground in a seedling bed should keep level; Seedling bed 2 A water level scale 6 is installed inside; the water inlet channel 3 is arranged on one side of the seedling bed 2, the water inlet channel 3 is ...
Embodiment 2
[0043] A seedling-raising workshop of a hard-based permeable seedling bed, which includes a seedling bed 2, an inlet channel 3 and a drainage channel 9, and the seedling bed 2 includes a water-permeable layer and a hard foundation 16 formed after flattening and compacting, and the water-permeable layer is Laying on the hard foundation 16, the permeable layer is composed of a fine gravel layer 15 and a fine sand layer 14, and the fine sand layer 14 is laid above the fine gravel layer 15; the thickness of the fine gravel layer 15 is 20-60mm, and the fine sand The thickness of the layer 14 is 10-30mm; the seedling bed 2 is provided with surrounding ridges 7, and the seedling bed 2 is arranged side by side in multiple blocks, the width of the multi-block seedling bed 2 is consistent, and the ground in a seedling bed should be kept level; The multiple seedbeds 2 arranged side by side are arranged in steps, and the drop can be set according to the terrain, and the height of the drop ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com