Double-beam gantry stacking crane and application workshop thereof
A crane and stacking technology, applied in the field of double-girder bridge gantry stacking cranes and their application workshops, can solve the problems of difficult material handling, difficulty in putting into shelves, easy turning and swinging, etc., to improve warehouse utilization rate, The effect of high handling flexibility and high safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as Figure 1 to Figure 5 As shown, a double-beam bridge portal type stacking crane includes a bridge portal frame, a cart, a trolley and a spreader. The cart is set on the guide rail of the bridge door frame and moves back and forth along the bridge door frame, the trolley is set on the cart, and moves back and forth along the cart, and the spreader is set on the cart. Such as Figure 4 As shown, the trolley is divided into an upper trolley 14 and a lower trolley 15. The upper trolley 14 is equipped with a hoisting mechanism and is connected to the fixed carriage 1 of the spreader through a flange 20; the lower trolley is equipped with a traveling mechanism and a rotary motor 18. The upper trolley 14 and the lower trolley 15 are connected by a slewing support (bearing), wherein the slewing support inner ring 17 is fixedly connected to the lower trolley 15, the slewing support outer ring 16 is fixedly connected to the upper trolley 14, and the slewing support outer r...
Embodiment 2
[0045] In the first embodiment, the track one 4 and the track two 5 are designed as guide grooves, the moving carriage 2 is connected to the track one 4 through rollers, and the forklift carriage 3 is also connected to the track two 5 through the rollers; or the track one 4 and the track two 5 One is a guide rail and the other is a guide groove. For the moving carriage 2 and the forklift carriage 3, the sliding blocks corresponding to the guide rails or the rollers corresponding to the guide grooves are connected to the rail one 4 and the rail two 5 respectively.
Embodiment 3
[0047] Such as Image 6 As shown, in order to ensure that the force of the wire rope 13 is even, a balance arm 12 is provided on the fixed pulley group 6, and the fixed pulley group 6 containing three fixed pulleys is replaced with a combination of a fixed pulley group 6 containing two fixed pulleys and a balance arm 12, and balance The arm 12 is connected to the movable pulley block 7 through a wire rope 13.