Method for applying bim technology in tunnel construction process

A technology for tunnel construction and construction scheme, applied in the field of construction and tunnel construction, can solve problems such as differences in tunnel specification requirements, inability to intuitively understand construction requirements, affecting the efficiency and quality of tunnel construction, and improve construction efficiency and convenience. Effectiveness of communication processing, ease of modification and access to data

Pending Publication Date: 2020-12-01
厦门众合天元科技股份有限公司
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a method for the application of BIM technology in the tunnel construction process, so as to solve the problem that the construction personnel cannot intuitively understand the construction requirements when referring to the drawings in the above background technology, and the actual construction of the tunnel will occur. There are differences between the specifications and requirements of the drawing design during the process, which affects the efficiency and construction quality of the tunnel construction, and the construction side cannot communicate with the designer in a timely manner for emergencies during the construction process, and consult relevant suggestions, which affects the accuracy of the project.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for applying bim technology in tunnel construction process
  • Method for applying bim technology in tunnel construction process
  • Method for applying bim technology in tunnel construction process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0034] see Figure 1-4 , the present invention provides a technical solution of a method for applying BIM technology in the tunnel construction process: a method for applying BIM technology in the tunnel construction process includes the following steps:

[0035] S1. Modeling in bim: read the information elements of the tunnel, and establish a 3D digital model describing the construction plan. The 3D digital model includes the environment model and the constru...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for applying a bim technology in a tunnel construction process, which comprises the following steps: S1, modeling in bim: reading tunnel information elements, and establishing a three-dimensional digital model; s2, simulating a construction process: performing construction simulation analysis, and performing comparison, selection and optimization of construction schemes; s3, determining a construction scheme: supplementing and modifying according to various collision detection and simulation construction processes in the construction process; and S4, establishing a sharing platform: establishing a lightweight sharing platform based on the optimal construction scheme. According to the invention, the traditional tunnel construction is combined with the bim technology; generating a corresponding three-dimensional digital model and a digital construction scheme after comparison; the internal and external environments of the tunnel and specific constructionprocedures can be visually and truly reflected, integrated control from the whole to details is achieved, designers can conveniently change and consult data in time. Meanwhile, emergencies occur during construction, all levels of personnel can conveniently communicate and handle the emergencies in time, and the tunnel construction efficiency is improved.

Description

technical field [0001] The invention relates to a construction method, in particular to a method for applying BIM technology in the tunnel construction process, and belongs to the technical field of tunnel construction. Background technique [0002] BIM construction technology refers to the building information model or building information management, which is based on the relevant information data of the construction project, establishes a three-dimensional building model, and simulates the real information of the building through digital information simulation, which has information completeness. , Information relevance, information consistency, visualization, coordination, simulation, optimization and graphability. [0003] A tunnel is an engineering building buried in the ground, and it is a form of human use of underground space. Tunnels can be divided into traffic tunnels, hydraulic tunnels, municipal tunnels, mine tunnels, and military tunnels. The structure of the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/20E21D11/10E21D11/38E21F16/02G06F111/10
CPCG06F30/13G06F30/20E21D11/10E21D11/38E21F16/02G06F2111/10
Inventor 吴宏彦陈礼捷李招宾吕杰民许志勇林冰雄林嘉利王琦
Owner 厦门众合天元科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products