Method for constructing pond suitable for frogs to inhabit in green land
A technology of ponds and green spaces, applied in the field of landscaping, can solve the problems of single water body landscape and poor ecological effect, and achieve the effect of improving ecological effect, increasing ecological diversity and retaining ornamental value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0034] This embodiment, as the basic embodiment of the present invention, discloses a method for constructing a pond suitable for frog habitat in a green space, which includes the following steps:
[0035] S1. According to the construction plan, lay out the line at the designated place, and carry out earthwork excavation at the designated place. The foundation pit after excavation will be used as the pond body. The pond body after excavation is bowl-shaped. The excavation depth of the pond body shall not be less than 80cm for earthwork tamping operations; the selected construction site is preferably with a stable natural water source, and at the same time, the natural water source will be connected with a pond body through open ditches or hidden pipes, and Install water source control devices such as valves in open channels or hidden pipes;
[0036] S2. Lay a waterproof blanket on the surface of the pond body tamped in step S1. After laying, lay a clay layer 2 on the surface o...
Embodiment approach 2
[0042] This embodiment, as a preferred embodiment of the present invention, discloses a method for constructing a pond suitable for frog habitat in a green space, which includes the following steps:
[0043] S1. Lay out the line at the designated location according to the construction plan, and carry out earthwork excavation at the designated location. The foundation pit after excavation is used as the pond body. The pond body after excavation is set in a cascade structure. A total of 2-4 levels are set up; after the earthwork is completed, the plain soil on the surface of the pond body will be earthwork compacted;
[0044] The selected construction site should preferably have a stable natural water source. At the same time, the natural water source will be connected to the pond body through an open ditch or a hidden pipe, and water source control devices such as valves will be installed in the open ditch or hidden pipe;
[0045] When excavating multiple ponds, the pond closes...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com