Baseline-based machining process blanking man-hour calculation method
A technology of mechanical processing and calculation methods, applied in the field of digital manufacturing, can solve problems such as low work efficiency, error-prone, and heavy workload of fixed-hour personnel, and achieve the effect of improving production efficiency and meeting production needs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0090] Example 1: Calculation of man-hours for bar blanking
[0091] 1. After the manufacturing department receives the task of product development and transfer to production, it starts to prepare production information. The product specification is aluminum alloy with a diameter of 20mm.
[0092] 2. Fill in the blanking calculation parameters in the process card of the process baseline. The bar calculation parameters are filled in as shown in Table 1.
[0093] Table 1 Bar blanking calculation parameters
[0094]
[0095] 3. In the process baseline, prepare the blanking man-hour quota data of a single machining process card. The formula for calculating the working hours of the bar is:
[0096] Step man-hour = T 基 ×shape factor÷60
[0097] where T 基 It is determined by the two parameters of bar material diameter and material. T 基 =6. The shape factor of the bar stock is equal to 1. Therefore, the working time of the bar is: 0.1.
[0098] 4. After receiving the off...
Embodiment 2
[0107] Example 2: Calculation of man-hours for shearing and blanking
[0108] 1. After the manufacturing department receives the task of product development and transfer to production, it starts to prepare production information. The product specification is 777mm in length, 515mm in width and 5mm in thickness.
[0109] 2. Fill in the blanking calculation parameters in the process card of the process baseline. The sheet calculation parameters are filled in as shown in Table 1.
[0110] Table 3 Sheet blanking calculation parameters
[0111]
[0112] 3. In the process baseline, prepare the blanking man-hour quota data of a single machining process card. The formula for calculating the man-hours of the shearing steps is:
[0113] Step man-hour = (T 基1 +T 基2 )×coarse and fine shearing coefficient×shearing method×area coefficient÷60
[0114] T 基1 and T 基2 It is jointly determined by the three parameters of the length, width and thickness of the blank, and the T 基1 =10....