Long-distance concrete culvert pipe curved jacking pipe installation method
An installation method and long-distance technology, applied in the direction of pipes/pipe joints/fittings, pipe laying and maintenance, mechanical equipment, etc., which can solve the problems of difficult control of jacking parameters, long jacking distance, and crushing of concrete at pipe joints. , to achieve the effect of improving project economic benefits, avoiding investment costs, and speeding up project progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] The present invention discloses as figure 1 A long-distance concrete culvert curve pipe jacking installation method shown includes the following steps:
[0044] S1 carries out the measurement construction of long-distance curved pipe jacking, and enters the construction preparation after measurement and stakeout;
[0045] S2 carries out the installation of the track, the top plate of the rear seat, the jack of the rear seat and the water stop device of the hole in sequence, and then installs the jacking equipment;
[0046] Power on S3 and run the pipe jacking machine to make it in place in the well of the pipe jacking machine. After the door panel is separated, the rear seat jack is jacked in;
[0047] S4 Make mud preparations, the pipe jacking machine goes out of the hole, drives the concrete culvert pipe jacking, and performs deviation measurement and jacking correction during the process;
[0048] S5 carries out splicing of pipe joints. After the completion, the in...
Embodiment 2
[0058] In this embodiment, through the research on the construction technology of long-distance concrete culvert curved pipe jacking, the long-distance curved pipe jacking construction across Cidu Avenue (211 Provincial Highway) is safely and smoothly in place.
[0059] This embodiment discloses the measurement construction of long-distance curved pipe jacking. The construction of the curved pipe jacking project is guaranteed by a reliable plane and elevation control system. The main task of the measurement work in the construction stage is to locate, stake out, and Installation, as well as jacking and pointing services for construction, so the measurement work should follow the principle of from the whole to the part during the construction. The measurement of curved pipe jacking construction is a meticulous work. It needs to have sufficient accuracy, otherwise it will bring hidden dangers to the quality of the entire project. Special attention should be paid to re-measurement...
Embodiment 3
[0078] In this embodiment, through the research on the construction technology of long-distance concrete culvert curved pipe jacking, the long-distance curved pipe jacking construction across Cidu Avenue (211 Provincial Highway) is safely and smoothly in place.
[0079] This embodiment discloses long-distance curved pipe jacking correction. The deviation of the pipeline from the axis is mainly caused by the imbalance of external forces acting on the tool pipe. The main reasons for the imbalance of external forces are:
[0080] (1) The propelling pipeline cannot be absolutely in a straight line;
[0081] (2) The curved surface of the pipe cannot be absolutely perpendicular to the axis of the pipe;
[0082] (3) The compressibility of the backing plate between the pipe joints is not completely consistent;
[0083] (4) The resultant force of the head-on resistance of the pipe jacking is not necessarily consistent with the reasonable coincidence of the pushing force of the rear en...