Arch-first and beam-second construction method for bracket-free tied arch
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- 浙江省建投交通基础建设集团有限公司
- Publication Date
- 2021-03-26
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method of a bracketless tie rod arch first arch and then beam. Background technique
[0002] The traditional support method construction starts from the ground and builds the steel pipe support to the vault, and then carries out formwork, pouring, maintenance and other constructions. The biggest advantage of this method is that it does not require large-scale hoisting equipment, and its disadvantage is the consumption of support formwork for construction. Large, long construction period, large investment of manpower, steel pipe support erection requires high bearing capacity of the foundation, and the bearing capacity of the steel pipe rod of the conventional full hall support is limited, and the safety risk is relatively large. For large-volume concrete structures, pouring in sections and blocks There are many, high requirements for pouri...