Pneumatic down-the-hole hammer vibration jet grouting pile inserted steel pipe composite foundation and pile foundation construction method

A construction method and technology for composite foundations, which are applied in basic structure engineering, sheet pile walls, buildings, etc., to achieve the effect of saving the use of reinforced concrete, saving time and effort, labor and money, and ensuring bearing capacity and settlement deformation.

Pending Publication Date: 2021-08-24
北京建材地质工程有限公司 +2
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention provides a composite foundation with pneumatic down-the-hole hammer vibrating rotary grouting piles inserted into steel pipes and its construction method to solve the above-mentioned problems existing in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pneumatic down-the-hole hammer vibration jet grouting pile inserted steel pipe composite foundation and pile foundation construction method
  • Pneumatic down-the-hole hammer vibration jet grouting pile inserted steel pipe composite foundation and pile foundation construction method
  • Pneumatic down-the-hole hammer vibration jet grouting pile inserted steel pipe composite foundation and pile foundation construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] Ground grouting reinforcement design for Building A of Block C2 Financial Project of Shijingshan Yinhe Business District K

[0036] 1. Design conditions

[0037] Tower A is ±0.00=70.50m, the natural ground elevation is temporarily taken as 66.0m, the foundation top elevation of the core tube is -22.50m, and the foundation thickness is 2.50m, and the foundation top elevation of other parts is -22.50m, and the foundation thickness is 0.80m.

[0038] According to the "Supplementary Explanation of the Geotechnical Engineering Survey Report of C2 Financial Project of Block K in Shijingshan Yinhe Business District", the base of Block A is ④ broken zone layer, and the bearing capacity and settlement cannot meet the design requirements. According to the requirements of the design institute, the broken zone is now carried out. Grouting reinforcement, while dealing with cave filling problems, to meet the design requirements.

[0039] According to the foundation reaction diagram ...

Embodiment 2

[0049] A tunnel pile project in Chongqing, because the tunnel has to pass through a deep ditch with land filling section, the deep ditch is filled with various boulders, boulders, and riprap, with a depth ranging from 3 to 20m. In order to ensure uniform settlement, the The tunnel with a height of ~4.8m is designed with red cloth piles. The number of piles is 2188, the pile diameter is 600mm, the spacing is 1.7m*1.7m, and the pile length is 4-22m. . This poses a great challenge to the construction unit. Firstly, the height of the equipment should not exceed 3m, and secondly, it should be able to break through the fill layer of rocks, boulders, boulders and ripraps, then lower it into a steel cage, and pour concrete into piles. Later, considering the construction restrictions of ultra-low rotary excavation and reverse circulation drilling rigs, it was changed to 998 piles with a diameter of 1m.

[0050] For this reason, we proposed to use a low-slung pneumatic down-the-hole h...

Embodiment 3

[0052] Pile foundation construction in a limestone stratum in Guangzhou, a small high-rise building with 9 to 11 floors above the ground. I chose the percussion drilling method. When encountering inclined holes or karst caves, I backfilled the rubble, and then impacted through holes again for treatment. Some piles with a diameter of 800mm and a length of 45m had not been drilled in 5 months. The construction party was anxious, and the construction party also Complaining is difficult, losing money, and claiming compensation. The design institute also said that it can only be so. All three parties are caught in a vortex of contradictions, and everyone is worried about the slow progress, but they cannot come up with a good solution.

[0053] For this reason, we propose to use the pneumatic down-the-hole hammer vibrating rotary grouting pile drilling rig for construction, and use one pile to support one pile (if necessary, multiple piles can be used to support one pile). The diam...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pneumatic down-the-hole hammer vibration jet grouting pile inserted steel pipe composite foundation and a pile foundation construction method. The construction method comprises the steps that drilling is conducted; after drilling to the designed depth, a water pump of the drilling machine is switched into a high-pressure pump to pump cement paste, the high-pressure paste is subjected to high-pressure air jet grouting, vibrated and lifted, and the jet grouting pile is formed; a steel pipe is inserted into the center of the pile to form a stiffened core cement soil steel pipe pile; and the steps are repeated, a plurality of stiffening core cement soil steel pipe piles are constructed at intervals according to the design, and a composite foundation or a steel pipe pile foundation is formed. The method has the advantages that the application range is wide, the construction speed is high, the bearing capacity and settlement deformation requirements can be met, and the comprehensive cost is low.

Description

technical field [0001] The invention relates to a construction method of composite foundation and (steel pipe) pile foundation with pneumatic down-the-hole hammer vibrating rotary spraying piles inserted into steel pipes, which are mainly used in hard, broken, uneven, karst caves, boulders, boulders, thrown stones, etc. Foundation construction is carried out in complex strata such as rocks or where the height of the construction space is limited. Background technique [0002] At present, when people encounter hard rock formations with broken zones in the middle or formations with karst caves, or filling layers with uneven thickness such as boulders, boulders, and riprap, they often think of using pile foundation design to penetrate these formations. On solid ground, this can lead to a whole host of problems. For example, in a project in Shijingshan District, Beijing, the stratum is hard rock. The geological prospecting unit conducted the survey in accordance with the standa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/46E02D5/28E02D15/04
CPCE02D5/46E02D5/285E02D15/04E02D2300/0023E02D2300/0029E02D2250/003
Inventor 何世鸣李江郭党生周与诚郁和坤陈辉黄鑫峰贾城梁成华司呈庆梁德周王海宁洪伟岳忠杰张宝河杜高恒郭跃龙陈鹏
Owner 北京建材地质工程有限公司