Asynchronous decoupling construction method for large foundation pit coupling inner supporting system
A support system and foundation pit technology, which is applied in infrastructure engineering, excavation, construction, etc., can solve problems such as large mechanical vibration, large dust, and extended construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0045] like figure 1 As shown, the present invention provides an asynchronous decoupling construction method of a large-scale foundation pit coupling internal support system, the large-scale foundation pit coupling internal support system adopts a ring support system, and the asynchronous decoupling construction method includes the following steps:
[0046] Working condition analysis 100: analyze the structural working condition of the basement according to the building construction plan;
[0047] Decoupling design 200: set the decoupling model according to the support system at different positions;
[0048] Construction of decoupling reinforcement measures 300: Reinforcement construction for the weak position of the force system of the supporting structure;
[0049] Collision point underpinning construction 400: Use BIM technology to check the collision between the basement structure and the inner supporting lattice columns, and propose an underpinning construction plan acco...
specific Embodiment 2
[0082] A construction project is located in the central core area of the urban area, and the project consists of 2 super high-rise skyscrapers and a high-end commercial center. The excavation depth of the foundation pit is 22.7m, the total area is 34,000 square meters, and the circumference is 810m, which belongs to the deep and large foundation pit. Due to the depth of the foundation pit and the fact that it is built next to the river, the site is rich in groundwater and located in the bustling area of the city center. There are basements of high-rise buildings and subway tunnels around it. To ensure the safety of the surrounding environment and the foundation pit, a double ring coupling branch was adopted protection system, and asynchronous decoupling using the asynchronous decoupling construction method of a large-scale foundation pit coupling internal support system provided by the present invention.
[0083] Further, working condition analysis 100: such as image 3 A...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com