A technology of load testing and new energy, applied in the direction of motor generator testing, measuring electricity, measuring devices, etc., can solve the problems of difficult size, limited load adjustment range, real-time adjustment, etc., achieve a wide range of load thresholds, and easy to operate. line, the effect of a large adjustment range

Active Publication Date: 2021-12-10
SUZHOU YINGTEMO AUTOMOBILE TECH CO LTD
View PDF10 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] For the general new energy motor load test, the motor under test is loaded with a certain amount of load for a long time, and the data of the motor is monitored in real time. In real-time adjustment, the reloading of the load can only be carried out after stopping the operation, which makes the whole test process cumbersome, and the adjustment range of the load is limited, and the linear load regulation needs to be solved urgently. For different types of motors, for example, for different The size and height of the motor need to be connected with the transmission shaft at the load end according to the position of the motor output shaft. Adaptive adjustments are required for the position of the fixed motor rack. Usually, a separate design of the test platform is required, resulting in a large amount of research and test resources. waste, based on this, the present invention designs a new energy motor load test system to solve the above problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • New energy motor load test system
  • New energy motor load test system
  • New energy motor load test system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0032] The present invention provides a technical solution: a load testing system for new energy motors, which is used for load testing of various new energy motors of different models and specifications. In the present invention, such as figure 1 As shown, the system includes an adjustment base 3, a support platform 6, a flexible connection mechanism 5, a load adjustment assembly 8, an extruding part 9 and a pressure regulation part 10, and the adjustment base 3, t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a new energy motor load test system in the technical field of motor testing. The new energy motor load test system comprises a test platform, an adjusting base, a test frame and a load adjusting assembly; a test motor is mounted on the adjusting base, and the adjusting base can be adjusted in a front-back sliding manner to adaptively mount different types of motors; and the load adjusting assembly is arranged between the transmission rods, real-time pressure regulation and control are performed on the extrusion part through the pressure regulation and control part, load pressure buffer application is performed on one end of each transmission rod by the extrusion part, and loading force loading is performed on the test motor by the load adjusting assembly through friction force. The new energy motor load test system is suitable for carrying out load test on the new energy motor; Through the test system, data such as temperature rise, noise and rotating speed of the new energy motor under different loads can be obtained, the load adjusting assembly adjusts and controls friction force through oppositely arranged friction plates, linear adjustment of load force is implemented, and load modification can be carried out without shutdown.

Description

technical field [0001] The invention relates to the technical field of motor testing, in particular to a new energy motor load testing system. Background technique [0002] The motor drive control system is the main execution structure in the driving process of new energy vehicles. The fuel cell vehicle FCV, hybrid vehicle HEV and pure electric vehicle EV in the new energy vehicles all use electric motors to drive the wheels to drive the existing motor test system. [0003] For the general new energy motor load test, the motor under test is loaded with a certain amount of load for a long time, and the data of the motor is monitored in real time. In real-time adjustment, the reloading of the load can only be carried out after stopping the operation, which makes the whole test process cumbersome, and the adjustment range of the load is limited, and the linear load regulation needs to be solved urgently. For different types of motors, for example, for different The size and h...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/34G01D21/02
CPCG01R31/343G01D21/02
Inventor 陈军杨杰陆晖
Owner SUZHOU YINGTEMO AUTOMOBILE TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products