Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for earth pressure balance shield to penetrate through composite stratum

An earth pressure balance shield and composite stratum technology, applied in earthwork drilling, underground chamber, wellbore lining, etc., can solve problems such as construction difficulties, cracks in water storage structures, water flow infiltration, etc. Stability, vibration reduction effect

Pending Publication Date: 2022-02-18
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP +1
View PDF1 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The above-mentioned existing technical solutions have the following defects: when using the above-mentioned construction method for construction, when encountering water storage structures such as groundwater layers or reservoirs, during the construction blasting and shield tunneling, the underground The vibration of the soil layer can easily lead to cracks in the water storage structure, resulting in water infiltration, which brings great difficulties to the construction, so it needs to be improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for earth pressure balance shield to penetrate through composite stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0039] refer to figure 1 , which is a construction method for an earth pressure balance shield passing through a composite stratum disclosed in the present invention, comprising the following steps:

[0040] S01, preliminary preparation:

[0041] Find out the specific location of the water storage structure, determine the relative positional relationship between the water storage structure and the shield tunnel, and draw the outer contour of the shield tunneling route with red paint on the ground, so as to determine the distribution of subsequent drilling holes At the same time, the drilling direction control line is set along the shield tunneling direction at the center line of the outer contour line on the ground, so as to guide the drilling direction for the staff and facilitate subsequent drilling; the underground soil layer is detected by geological dri...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for an earth pressure balance shield to pass through a composite stratum, which comprises the following steps of: S01, early-stage preparation is carried out: the specific position of a water storage structure is ascertained, and the relative position relationship between the water storage structure and a shield tunnel is determined; S02, underground drilling is carried out: specifically, after the relative position of the water storage structure and the shield tunneling route is determined, the distribution position of blast holes is firstly determined beyond the safe distance from the edge of the water storage structure, and then drilling is carried out on the ground; S03, deep hole blasting is conducted, specifically, after drilling is completed, deep hole blasting is conducted, and after blasting is completed, blast holes are sealed with cement mortar; S04, ground reinforcement is conducted, specifically, after blasting is completed, grouting reinforcement is conducted on the ground; and S05, shield tunneling is conducted, specifically, a shield tunneling machine is controlled to penetrate through the water storage structure with appropriate shield parameters. The method has the effect of conveniently penetrating through water storage structures such as a reservoir to reduce water flow permeation.

Description

technical field [0001] The invention relates to the technical field of underground engineering construction, in particular to a construction method for an earth pressure balance shield tunneling through a composite stratum. Background technique [0002] At present, in underground engineering construction, encountering boulders during the excavation of the shield machine often leads to a sudden increase in the pressure at the front end of the cutterhead, which is easy to jam the cutterhead, wear the cutter, and severely deform the cutter seat. Therefore, how to ensure the shield machine Safe, effective and fast passage through the boulder area has been a research topic in the development of underground space. [0003] The existing Chinese patent with authorized publication number CN110513114A provides a construction method for shield tunneling through high-strength boulder groups, including the following steps: Step 1: do geological exploration in advance according to the rou...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)