Casting process for embedded steel pipe of lathe bed with cooling pipe
A technology of casting technology and cooling pipe, which is applied in the field of embedded steel pipe casting technology, can solve problems affecting the quality of castings, and achieve the effect of reducing hindered bending
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Since the guide rail surface at the pre-embedded steel pipe is 120mm, the thickness of the casting reaches 120mm. In order to accelerate cooling, the outer surface of the casting is laid with coated sand chill iron. According to the usual pouring scheme, use Porcelain tube is used as the inner gate, and a layer of gate is set on the top of the casting shape to supplement the pouring gap. The pouring time is 120-130S and the pouring temperature is 1380-1400℃. In order to prevent the pre-embedded steel pipe from bending and deformation during casting and cooling, Place three clips at intervals of 600mm to fix, loosely fill 50mm asbestos rope at both ends of the steel pipe, and use asbestos rope to block the gap at both ends of the steel pipe to prevent molten iron from flowing into the steel pipe through the gap during casting, causing the steel pipe to be blocked and scrapped.
Embodiment 2
[0031] Verification of Steel Tube Melt Resistance: Preparation 4 pieces of round steel of the same material, coated with specified paint, including high temperature resistant materials, dried for later use. When the furnace is turned on, put it into the ladle at a temperature higher than 1450°C to check the melting condition. The situation is as follows:
[0032] Bar No. Hot metal temperature heating time degree of paint damage test rod melting 1 1460℃ 60S intact none 2 1460℃ 90S intact none 3 1465℃ 300S slightly damaged none 4 1460℃ 30S No paint protection melt fillet
[0033] Under the condition of coating protection, the round steel will not melt within a certain period of time, so the pre-embedded pipe body 2 coated with high-temperature resistant materials is selected, and the heating time is guaranteed not to exceed 130s, and the heating time in hand The interval guarantees a suitable heating temperature of...
Embodiment 3
[0035] Verify the bending of steel pipes: take 2 steel pipes of 2000mm, one of which is welded with 3 clips and 6 places are evenly distributed, and the other is not provided with clips, respectively embedded in a cavity of 150x150x1800mm, and loosely filled with 50mm asbestos rope at both ends of the steel pipe , After pouring, the position of the steel pipe fixed with clips meets the requirements, and the steel pipe without clips still bends. Therefore, it is decided that in actual production, in addition to the measures that the steel pipe can be heated and elongated, it should be fixed with clips to control the bending deformation.
[0036] Embodiment 2 and Embodiment 3 of this scheme are verification experiments for Embodiment 1 to verify the temperature and implementation time of Embodiment 1, and the fixing method of the pipe body.
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 

