Construction method of steel structure formwork-free self-insulation floor slab
A construction method and formwork-free technology, which is applied to floors, building components, building structures, etc., can solve the problems of slow floor installation process, large concrete laminated slab area, and high hoisting cost, so as to speed up the construction progress and save raw materials , flexible and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] refer to figure 1 , a kind of steel structure formwork-free self-insulation floor construction method, comprising steel girder 1, main girder 7, secondary flute 3, described steel girder 1 comprises parallel upper wing plate 4, lower wing plate 5 and vertical connection on the upper The web 6 between the wing plate 4 and the lower wing plate 5, the main beam 7 is set between the two parallel steel beams 1, and the two ends of the main beam 7 are respectively placed on the lower wing plate of the two parallel steel beams 1 5, the secondary flute 3 is set on the main girder 7, the thermal insulation laminated board 8 is laid on the secondary flute 3, the steel bar is set on the thermal insulation laminated board 8, and then concrete is poured.
Embodiment 2
[0032] refer to figure 2 , a steel structure formwork-free self-insulation floor construction method is characterized in that it includes a steel beam 1, a steel square tube 2, and a second corrugation 3, and the steel beam 1 includes an upper wing plate 4 and a lower wing plate 5 parallel to each other. and the web 6 vertically connected between the upper flange 4 and the lower flange 5, a steel square tube 2 is set between two parallel steel beams 1, and the two ends of the steel square tube 2 are respectively placed in two parallel On the lower wing plate 5 of the steel girder 1, a secondary flute 3 is set on the steel square pipe 2, a thermal insulation laminated board 8 is laid on the secondary flute 3, steel bars are arranged on the thermal insulation laminated board 8, and then concrete is poured.