Water shut off technological process for viscous crude well

A technology of oil well water plugging and process method, which is applied in earthwork drilling, wellbore/well components, sealing/isolation, etc., which can solve problems such as high construction risk, formation pollution, and short effective time, and achieve low construction risk, Based on proven results with high success rates

Inactive Publication Date: 2005-03-16
杨双虎 +2
View PDF0 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to multiple rounds of huff and puff in heavy oil wells with steam injection thermal recovery, channeling outside the pipe often occurs, making it impossible to implement mechanical water shutoff, while cement diaphragm water shutoff is due to the cement solidification time and the fluidity of the cement slurry after dehydration in the formation. Influenced by factors such as variation, the plugging radius is small, the construction risk is high, and the effective time is short
In order to increase the plugging radius, a variety of high-temperature resistant inorganic plugging agents have been tested on site, but such plugging agents cause serious formation pollution, resulting in a significant decline in the throughput of oil wells, which cannot fully meet production needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0011] Example 1: Water plugging of 81-598 heavy oil wells in an oil field. According to the above implementation steps, the first slug is mixed with 1.2 tons of polyacrylamide, 5 tons of rubber particles, 4 tons of elm bark powder and water, and the dosage is 360m 3 , the pumping pressure rose to 16.5Mpa to stop injection, and stabilized for half an hour; calculated according to the plugging radius of 1.5m, the second slug was made of 30 tons of bentonite and 20 tons of cement to form a 50m 3 Aqueous solution, squeezed into the formation for heat insulation, the pumping pressure is 13Mpa; calculated according to the plugging radius of 1m, the third slug uses 15 tons of cement to make an aqueous solution of 12m 3 Carry out sealing, the pumping pressure is 10Mpa.

Embodiment 2

[0012] Example 2: Water plugging in the heavy oil well 77-5100 of an oilfield, the construction steps are the same as above. Among them, the first slug: made of 1.5 tons of polyacrylamide, 5 tons of rubber particles and water, the dosage is 400m 3 , the pumping pressure is 16Mpa; the second slug: use 30 tons of bentonite and 20 tons of cement to form a 50m 3 Aqueous solution, squeezed into the stratum for heat insulation, the pumping pressure is 11Mpa; the third slug: 30 tons of water glass made into 50m 3 The aqueous solution is used for sealing, and the pumping pressure is 11Mpa.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention relates to a thick oil well water shut off technological process for thick oil well water shut off layer and improving exploitation effect. The process bases on 'deep move shallow shut off' principal, first selectively shutting off the big diameter for the oil layer by degradable organic shut off additives, then sealing the opening by high temperature resistant inorganic shut off additives, and realizing selective water shut off by pressure control and degradation of organic matter. The water shut off process is reasonable in design, reliable in criterion, and has the characteristic of small construction risk, high success rate and long validity period compared with other thick oil well water shut off processes, and provides a new effective process for solving the water shut off problem for thick oil especially middle thick oil well.

Description

Technical field: [0001] The invention relates to a process for oil wells, especially heavy oil wells, to block water layers and improve production effects. Background technique: [0002] With the continuation of the oilfield development process, the water content of crude oil and the water production of oil wells continue to increase, which has a negative impact on crude oil production and production effects. Blocking the water layer and improving the production effect have become an important issue in the production of heavy oil wells. Since ordinary chemical water shutoff cannot withstand high temperature, the current conventional heavy oil water shutoff mainly adopts two methods: mechanical water shutoff and cement partition water shutoff. However, due to multiple rounds of huff and puff in heavy oil wells with steam injection thermal recovery, channeling outside the pipe often occurs, making it impossible to implement mechanical water shutoff, while cement diaphragm wat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21B33/13
Inventor 杨双虎徐凤廷白云渡
Owner 杨双虎
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products