Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

54results about How to "Prevent cracking and falling off" patented technology

Square steel confined concrete arch center wall back filling bolting-grouting support system and construction method

The invention discloses a square steel confined concrete arch center wall back filling bolting-grouting support system and a construction method. The square steel confined concrete arch center wall back filling bolting-grouting support system comprises high-strength anchor rods, grouting anchor rods, grouting anchor cables and multiple square steel confined concrete arch centers, wherein adjacent square steel confined concrete arch centers are connected through longitudinal beams, anchor rod holes are formed in the longitudinal beams, longitudinal beam anchor rods penetrate the longitudinal beams through the anchor rod holes to be anchored into a surrounding rock, a wall back filling layer is arranged between the square steel confined concrete arch centers and the surrounding rock, and the square steel confined concrete arch centers, the wall back filling layer and the tunnel surrounding rock are connected through the longitudinal beam anchor rods. The high-strength anchor rods, the grouting anchor rods and the grouting anchor cables are constructed before the square steel confined concrete arch centers are erected. The square steel confined concrete arch center wall back filling bolting-grouting support system and the construction method are applicable to supporting of underground projects including weak broken surrounding rock tunnels and the like, the square steel confined concrete arch center wall back filling bolting-grouting support system has the advantages of being high in strength, good in stability, reasonable in stress and the like, and the square steel confined concrete arch center wall back filling bolting-grouting support system and the construction method can effectively improve the primary supporting strength after tunnel excavation and ensure the stability of the tunnel surrounding rock.
Owner:SHANDONG UNIV

Outer heat-insulation system of outer wall

ActiveCN101634170ACoating with low thermal conductivityHigh solar heat reflectivityWallsClimate change adaptationMesh gridEngineering
The invention relates to an outer heat-insulation system of an outer wall. The outer surface of a basal layer wall body (1) is sequentially provided with an interfacial agent processing layer (2-1), a bonding mortar layer (3), a polyphenyl plate heat-insulation layer (4), a interfacial agent bonding layer (2-2), a first flexible heat- insulation putty layer (6-1), a second flexible heat- insulation putty layer (6-2), a closed base paint layer (7), an elastic heat- insulation coating layer (8) and a mat coat varnish layer (9) from inside to outside, wherein the first flexible heat- insulation putty layer (6-1) is internally provided with glass fibre gridding cloth (5); and all the layers are combined with the basal layer wall body (1) into a whole after being dried and solidified; flexible heat-preserving putty of the two flexible heat-preserving putty layers, which contains 20-40 percent of heat-preserving materials, is formed, and elastic heat-preserving coating of the elastic heat-preserving coating layer (8), which contains 5-15 percent of heat-preserving materials, is formed. The outer heat-preserving system can prevent the polyphenyl plate heat- insulation layer (4) from cracking and desquamating caused by external temperature difference because of the heat preservation and isolation of the flexible heat- insulation putty layers and the elastic heat-preserving coating layer (8), thereby prolonging the service life of the heat-preserving system and enhancing the energy-saving effect of buildings.
Owner:CHINA NAT OFFSHORE OIL CORP +2

Thermally conductive adhesive with high glass transition temperature and preparation method thereof

The invention relates to the technical field of thermally conductive adhesives and discloses a thermally conductive adhesive with high glass transition temperature and a preparation method thereof. The thermally conductive adhesive is prepared from the following raw materials (by mass): 5-80% of an organic silicon epoxy prepolymer; 1-50% of cycloaliphatic epoxy resin; 1-20% of an oxetane monomer,0-20% of macromolecular polyol, 0.2-25% of a curing agent, 0.1-2% of an antioxidant, 0.1-0.5% of a light stabilizer, 0.0-0.5% of a defoaming agent, 5-90% of a thermally conductive filler, 0.0-5% of adispersing agent and 0.2-2% of a coupling agent, wherein the sum of the components is 100%. The thermally conductive adhesive provided by the invention has high glass transition temperature (higher than 100 DEG C), higher elastic modulus (higher than 1000MPa), better toughness (the elongation is higher than 5%) and higher binding power; the thermally conductive adhesive is suitable for bonding anoptical fiber ring in an optical fiber gyroscope, the overall heat conductivity coefficient of the optical fiber ring can be effectively improved, the temperature gradient of the optical fiber ring isreduced, the full-temperature error of the ring is reduced, and the precision of the gyroscope is improved.
Owner:武汉长盈鑫科技有限公司

Outer wall light-weight heat preservation and decoration integrated plate

The invention relates to an outer wall light-weight heat preservation and decoration integrated plate. The outer wall light-weight heat preservation and decoration integrated plate comprises a heat preservation plate, the outer surface of the heat preservation plate is coated with a light-weight reinforcing piece, the light-weight reinforcing piece is coated with mortar, and the surface of the mortar on one side of the heat preservation plate is provided with a decoration coating, so that the heat preservation and decoration integrated plate is formed, the heat preservation and decoration integrated plate is provided with an inner side face connected to a wall body and an outer side face provided with decorative coating, the heat preservation and decoration integrated plate is provided with a vent hole penetrating through the side wall of the heat preservation and decoration integrated plate, and a ventilation embedded part arranged in the vent hole. According to the outer wall light-weight heat preservation and decoration integrated plate, the formed light heat preservation and decoration integrated plate further reduces the mass of an outer wall heat preservation structure, the prefabricated ventilation embedded part penetrates through the heat preservation plate, the matching parts at the two ends of the ventilation embedded part are connected to anchoring parts of the wall body, the ventilation embedded part is provided with a ventilation cavity communicating with a plate seam, water vapor generated by the wall body can be conducted outwards, and the phenomena that the water vapor is frozen and expands, and the heat preservation decorative plate cracks and falls off are avoided.
Owner:斯蒙特节能科技(上海)有限公司

Ground pipeline corrosion prevention device for oil field and operating method

The invention discloses a ground pipeline corrosion prevention device for an oil field and an operating method. The ground pipeline corrosion prevention device comprises outer corrosion prevention pipes, oil pipes, supporting rings, a polyamide epoxy resin layer, rubber rings, a 3PE pyrocondensation material, a casing, a locking disk, a high density polyethylene layer and epoxy coal tar pitch. Theoil pipes are arranged inside the outer corrosion prevention pipes. The outer corrosion prevention pipes are provided with outer pipe inner holes. Connecting rings are arranged at one ends of the outer corrosion prevention pipes. The two adjacent outer corrosion prevention pipes are connected. The connecting rings are matched with the outer pipe inner holes and further connected with the corresponding outer pipe inner holes through threads. The two adjacent oil pipes are connected. The outer sides of the supporting rings are matched with the outer pipe inner holes and further inserted into the corresponding outer pipe inner holes. The supporting rings are provided with supporting ring inner holes. The outer sides of the rubber rings are matched with the supporting ring inner holes and further connected with the corresponding supporting ring inner holes. Rubber sleeve inner holes are formed in the rubber rings. The outer sides of the oil pipes are matched with the rubber sleeve inner holes and further connected with the corresponding rubber sleeve inner holes.
Owner:代玉梅

PTB (Polytechnisch Bedrijf Bvba/Sprl) multifunctional composite board for outer wall as well as preparation method and use method thereof

The invention discloses a PTB (Polytechnisch Bedrijf Bvba/Sprl) multifunctional composite board for an outer wall as well as a preparation method and a use method thereof. The PTB composite board is formed by integrally pressing a PTB interface agent mortar layer, a waterproof anti-crack plastering layer, a rockwool slab or a foam glass plate and a PTB interface agent mortar layer from outside to inside in sequence. The preparation process comprises the steps of molding, pouring, high-frequency vibrating, demolding and curing. According to the invention, the heat insulating and energy saving difficulties and the poor quality problem of the composite plate are solved; the finished product composite plate which is waterproofing, heat-insulating, wear-resistant and corrosion-resistant and never cracks is prepared by using a thin high-strength reinforced concrete injection pressing method, adding European imported original PTB emulsion and successfully carrying out molding and pressing with a heat insulation board through difficult vacuum-pumping treatment in one step in a mechanical way, and has the obvious economic benefits and environment-friendly benefits because the traditional heat insulation method is abandoned.
Owner:福建康波力特阳光建材有限公司

Outer heat-insulation system of outer wall

The invention relates to an outer heat-insulation system of an outer wall. The outer surface of a basal layer wall body (1) is sequentially provided with an interfacial agent processing layer (2-1), a bonding mortar layer (3), a polyphenyl plate heat-insulation layer (4), a interfacial agent bonding layer (2-2), a first flexible heat- insulation putty layer (6-1), a second flexible heat- insulation putty layer (6-2), a closed base paint layer (7), an elastic heat- insulation coating layer (8) and a mat coat varnish layer (9) from inside to outside, wherein the first flexible heat- insulation putty layer (6-1) is internally provided with glass fibre gridding cloth (5); and all the layers are combined with the basal layer wall body (1) into a whole after being dried and solidified; flexibleheat-preserving putty of the two flexible heat-preserving putty layers, which contains 20-40 percent of heat-preserving materials, is formed, and elastic heat-preserving coating of the elastic heat-preserving coating layer (8), which contains 5-15 percent of heat-preserving materials, is formed. The outer heat-preserving system can prevent the polyphenyl plate heat- insulation layer (4) from cracking and desquamating caused by external temperature difference because of the heat preservation and isolation of the flexible heat- insulation putty layers and the elastic heat-preserving coating layer (8), thereby prolonging the service life of the heat-preserving system and enhancing the energy-saving effect of buildings.
Owner:CHINA NAT OFFSHORE OIL CORP +2

Sandwich heat insulation reinforced concrete shear wall and construction method thereof

The invention discloses a sandwich heat insulation reinforced concrete shear wall and a construction method thereof, belonging to the technical field of heat insulation walls and construction methods. The sandwich heat insulation reinforced concrete shear wall is characterized in that a first fixing mesh and a first vibration strengthening mesh are sequentially arranged in parallel at the outer side of a first heat insulation layer at intervals; a first connecting drawing wire is arranged in the first heat insulation layer, the inner end of the first connecting drawing wire is inserted into abearing wall body, and the outer end of the first connecting drawing wire is fixed with the first fixing mesh and the first vibration strengthening mesh; and a first outer template jack screw penetrating through a first outer protective layer is connected between the first fixing mesh and the first vibration strengthening mesh. When concrete is poured, a heat insulation screen plate and a template are subjected to an interconversion principle of a point load and an area load, the inner-side concrete and the protective layer are constructed respectively and independently, therefore, the process is simple, the quality is guaranteed, the construction speed is accelerated, a heat insulation layer and a main structure are completed at the same time, the construction period time of outer walls is shortened, the fireproof effect is remarkable, the problems, such as cracking and falling of the outer heat insulation layer of the outer walls, and the service life is prolonged.
Owner:李富厚
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products