Method for removing caustic sludge in caustic sludge pool completely and making them into urban industrial backfill soil
A technology for backfilling soil and alkali slag, which can be used in filling, solid waste removal, etc., can solve the problems of waste of land resources and large land occupation, and achieve the effect of less intermediate links, saving land resources, and good social effects.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] The method for cleaning the soda plant alkali slag pool and making it into urban industrial backfill soil comprises the following steps:
[0034] 1. Alkali slag treatment in the alkali slag pool:
[0035] a. will be filled with the alkali slag pond 1 that is no longer used, excavate four 10-20 square meters of ponds 3 at the four corners of the dam 2 with an excavator, as shown in Figure 1;
[0036] b. Drain the water in the pond 3 with a water pump;
[0037] c. Excavate deep trenches 4 on four sides of the alkali residue pond 1, and connect the ponds 3 that have been dug to remove the alkali residue, as shown in Figure 2;
[0038] d. Install a water pump at the depth of the deep ditch 4, drain the water, keep the ditch without accumulated water every day, let the alkali slag in the alkali slag pool dry naturally, and become solidified. If the alkali slag pool 1 is not used for a long time, the alkali slag will The alkali slag in the pool has been solidified, the four...
Embodiment 2
[0046] The alkali slag treatment of the alkali slag pool is the same as that of embodiment 1. In the process of making urban industrial backfill soil, the three operations are also the same as that of embodiment 1, and then can be backfilled with 10-30cm thick natural soil on the backfill soil upper layer.
Embodiment 3
[0048] The alkali slag treatment of alkali slag pond is the same as embodiment 1, in making urban industry backfill soil technology, will handle solidified type alkali slag 35%, fly ash 30%, natural soil 30% in two a operations, 5% of the waste quicklime is transported to the filling area, and the latter two processes are the same as in Example 1.