Method of leaching and repairing cadmium polluted coast saline soil
A technology for cadmium pollution and soil, which is applied in the field of leaching and repairing metal-contaminated soil, and can solve problems such as reducing the degree of Cd pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] The remediation soil is the reclamation soil of Wanqingsha Town, Nansha District, Guangzhou City. The average content of Cd in 0-30cm surface soil was 3.24mg / kg, 30-40cm 2.4mg / kg, 40-50cm 2.65mg / kg, 50-70cm 2.93mg / kg. The purpose of remediation is to reduce the average Cd content in the root layer soil of 0-30 cm required by general crops as much as possible. Apply 13.5 tons of desulfurization by-products per hectare, divided into 2 applications on average, and mix evenly with the soil. After each application, add fresh water to soak and rinse, each water consumption is 350 cubic meters per hectare, and the repair time for each rinse is 7 days. After leaching, the average content of Cd in the 0-30cm surface soil was 2.9mg / kg, and the removal rate of Cd was 10.5%. The average content of Cd in the soil at the depth of 50-70cm increased from 2.93mg / kg to 3.42mg / kg; the average content of Cd in the soil at the depth of 40-50cm basically maintained the original level of 2....
Embodiment 2
[0023] The remediation soil is the reclamation soil of Wanqingsha Town, Nansha District, Guangzhou City. The average content of Cd in 0-30cm surface soil was 3.24mg / kg, 30-40cm 2.4mg / kg, 40-50cm 2.65mg / kg, 50-70cm 2.93mg / kg. The purpose of remediation is to reduce the average Cd content in the root layer soil of 0-30 cm required by general crops as much as possible. Apply 54 tons of desulfurization by-products per hectare, divided into 8 applications on average, and mix evenly with the soil. After each application, add fresh water to soak and rinse, each water consumption is 400 cubic meters per hectare, and the repair time for each rinse is 7 days. After washing, the average content of Cd in the 0-30cm surface soil was 2.58mg / kg, and the removal rate of Cd was 19.6%. The average content of Cd in the soil at the depth of 50-70cm increased from 2.93mg / kg to 3.77mg / kg; the average content of Cd in the soil at the depth of 40-50cm increased from 2.65mg / kg to 2.93mg / kg.
Embodiment 3
[0025] The remediation soil is the reclamation soil of Wanqingsha Town, Nansha District, Guangzhou City. The average content of Cd in 0-30cm surface soil was 3.24mg / kg, 30-40cm 2.4mg / kg, 40-50cm 2.65mg / kg, 50-70cm 2.93mg / kg. The purpose of remediation is to reduce the average Cd content in the root layer soil of 0-30 cm required by general crops as much as possible. Apply 40.5 tons of desulfurization by-products per hectare, divided into 6 applications on average, and mix evenly with the soil. After each application, add fresh water to soak and rinse, each water consumption is 400 cubic meters per hectare, and the repair time for each rinse is 8 days. After leaching, the average content of Cd in the 0-30cm surface soil was 2.67mg / kg, and the removal rate of Cd was 17.9%. The average content of Cd in the soil at the depth of 50-70cm increased from 2.93mg / kg to 3.62mg / kg; the average content of Cd in the soil at the depth of 40-50cm increased from 2.65mg / kg to 3.03mg / kg.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More