Prestressed high-strength concrete pile
A high-strength concrete and concrete technology, which is applied to sheet pile walls, buildings, and infrastructure engineering, can solve problems such as increased production costs, waste, and increased environmental protection burdens for production companies, so as to reduce coal consumption, improve various performances, and reduce environmental protection. burden effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0014] Take 100kg of special mineral admixture and 300kg of cement to form the cementitious material. The self-made special mineral admixture is composed of slag powder, aluminum potassium sulfate, calcium oxide and fly ash, and the proportion of each component to the total amount of concrete is : Slag fine powder 27%, aluminum potassium sulfate 6%, calcium oxide 2%, fly ash 10%. And mix it with other concrete auxiliary materials to form concrete containing 400kg of cementitious material per cubic meter, form it by centrifugation, then let it stand for 1 to 1.5 hours, and cure it with steam for 6 hours at a curing temperature of 80 to 85°C, and then The high-performance concrete pipe pile of the present invention can be obtained after 3-7 days of natural curing.
Embodiment 2
[0016] Take 100kg of special mineral admixture and 320kg of cement to form the cementitious material. The self-made special mineral admixture is composed of slag micropowder, sulphoaluminate, calcium oxide and fly ash, and each component accounts for 30% of the total amount of concrete. The ratio is: 20% of slag fine powder, 8% of sulphoaluminate, 3% of calcium oxide, and 12% of fly ash. And mix it with other concrete auxiliary materials to form concrete containing 420kg of cementitious material per cubic meter, form it by centrifugation, then let it stand for 1 to 1.5 hours, and cure it with steam for 6 hours at a curing temperature of 80 to 85°C, and then The high-performance concrete pipe pile of the present invention can be obtained after 3-7 days of natural curing.
Embodiment 3
[0018] Take 150kg of special mineral admixture and 310kg of cement to form the cementitious material. The self-made special mineral admixture is composed of slag micropowder, sulphoaluminate, calcium oxide and fly ash. The ratio is: 25% of slag fine powder, 6% of sulphoaluminate, 3% of calcium oxide, and 11% of fly ash. And mix it with other concrete auxiliary materials to form concrete containing 460kg of cementitious material per cubic meter, form it by centrifugation, then let it stand for 1 to 1.5 hours, and use steam for 6 hours at a curing temperature of 80 to 85°C, and then The high-performance concrete pipe pile of the present invention can be obtained after 3-7 days of natural curing.
PUM
| Property | Measurement | Unit |
|---|---|---|
| compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More