Modularization construction method for nuclear power station nuclear island
A construction method and modular technology, applied in industrial buildings and other directions, can solve problems such as shortening the construction period, the efficiency of large/super-large transport hoisting/hoisting machinery cannot be fully utilized, and the effect is not significant.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The present invention comprehensively analyzes various construction technologies, construction management methods and experience in the construction of nuclear island projects in the first and second rounds of nuclear power plants in my country. On the basis of the shortcomings of huge resources and huge investment in temporary infrastructure construction on site, the concept of modular construction is used to put forward the modular concept and modular design appeal for the upstream engineering design, and the traditional construction concept and construction technology are carried out in the construction stage of the project. optimized and refined. And introduce P3 plan management technology, computer three-dimensional model technology, nuclear power plant open top method construction technology, factory manufacturing concept, use the parallel construction organization method of construction and installation engineering, and carry out in-depth construction and installati...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com