Paraffin rosin water plugging agent for water plugging of thick oil huff-puff well and water plugging construction method
A water blocking agent and heavy oil technology, which is applied in chemical instruments and methods, earthwork drilling, wellbore/well parts, etc., can solve problems such as cold damage of heavy oil production wells, and achieve the purpose of prolonging the effective period of oil production, improving the effective period, The effect of increasing oil output
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] A certain oil well was constructed with conventional modified paraffin wax emulsion, and the water used to prepare the plugging agent was generally below 25°C. The heavy oil well after construction only drained water at the initial stage and did not produce oil. Generally, the effect of increasing oil and reducing water would be seen after 10 days. The analysis shows that the heavy oil in the formation condenses when it is condensed, causing cold damage, and it will be normal when the temperature of the formation recovers. In addition, at low temperature, the paraffin wax crystallizes too early, which is not conducive to entering the deep formation, resulting in a shortened validity period.
[0027] For this oil well, adopt the water shutoff agent of the present invention and water shutoff construction technique, specific operation is as follows:
[0028] Take the oil layer thickness of 20 meters as an example:
[0029] Prepare 60 cubic meters of selective water blockin...
specific Embodiment
[0030] Specific examples: Jin 611-15-16 well. The well was put into production on May 12, 2003, 830.8-1028.5m, Yulou + Xinglongtai oil layer, 32.1m / 9 layers, average effective porosity 24.02, average formation permeability 0.9826μm 2 , formation crude oil viscosity 1526mPa.s, construction on May 22, 2009, preparation temperature is 80 ℃, effective paraffin content 20% + rosin content 5% selective water blocking agent 90 cubic meters, the temperature of the blocking agent is guaranteed by the boiler truck on site, The plugging agent is squeezed into the oil layer from the annulus of the oil sleeve by the pump truck, and the replacement liquid is 20 cubic meters of hot sewage. Shut down the well for 3 days after construction. After the well was opened, the oil increase was 1016.8t, and the precipitation was 6131.8m 3 , valid for 198d.
[0031] From 2009 to 2010, the present invention was tested for 16 well times, with an increase of 9775 tons of oil, an average increase of 61...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com