Method for quickly repairing cement concrete pavement
A cement concrete and fast technology, applied in road repair, roads, roads, etc., can solve problems such as affecting the normal operation of vehicles, blocking roads for a long time, hidden dangers of traffic safety, etc., to reduce road closure time, reduce plate damage, The effect of saving construction time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] An urban expressway is a cement concrete pavement with a slab thickness of 28cm and a width of 8m. The width direction is composed of two slabs, each 4m wide and 5m long. There are dowel rods and tie rods between the slabs. The dowel rods are 50cm long and 36mm in diameter. The tie rod is 70mm long and 20mm in diameter. Now a certain section of 8 boards is severely damaged and needs to be repaired quickly, and the method of the present invention is adopted.
[0016] First, prefabricate 32 1 / 4 slabs with a thickness of 26cm, reserve rod slots on the long sides and dowel bars on the short sides, embed lifting rings in the four corners of the slabs, and reserve grouting holes in the middle. Reinforcement in the slab, the long side is 18mm in diameter, the short side is 16mm in diameter steel bar, the steel bar grid size is 50cm×20cm, and the corners, embedded parts and reserved holes are attached to reinforce the steel bars. Use hydraulic impact equipment to remove the o...
Embodiment 2
[0018] A secondary road is a cement concrete pavement with a slab thickness of 28cm and a width of 8m. The width direction is composed of two slabs, each 4m wide and 5m long. There are no dowel bars and tie rods between the slabs. Now a certain section of 4 boards is severely damaged and needs to be repaired quickly, and the method of the present invention is adopted.
[0019] First, according to the needs, prefabricate 1 / 4 slabs with 16 pieces, slab thickness 26cm, embed 4 connectors on one side of the long side, buy 3 connectors on both sides of the short side, embed suspension rings in the four corners of the slabs, and reserve grouting holes in the middle . Reinforcement in the slab, the long side is 18mm in diameter, the short side is 16mm in diameter steel bar, the steel bar grid size is 50cm×20cm, and the corners, embedded parts and reserved holes are attached to reinforce the steel bars. Use hydraulic impact equipment to remove the original diseased plate, and then ar...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com