Construction method for bottom protection of long mouth of ultra-long closure embankment in silt fine sand deep overburden layer
A technology of deep covering layer and construction method, which is applied in water conservancy projects, sea area projects, infrastructure projects, etc., and can solve problems such as increased difficulty in damming, scouring of dragon mouths, and high throwing intensity, so as to achieve low construction difficulty and reduce loss. , The effect of low throwing intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] Such as figure 1 Shown, the construction method for bottom protection of the silt and fine sand deep overburden layer of the super-long closure embankment dragon mouth of the present invention comprises the following steps:
[0028] Step 1. Determine the position of the Longkou;
[0029] Step 2. Pre-occupy the embankment from one side of the river bed to the position of the dragon mouth, and fill the embankment to occupy the position of the dragon mouth and completely occupy the position of the dragon mouth, and use the other side of the river bed to flow through;
[0030] Step 3: Use large stones to protect the upper and lower side slopes of the embankment below the level of the bottom protection of the embankment that has been occupied; this can prevent the overburden of the riverbed from scouring, increase the roughness of the riverbed, and improve the efficiency of intercepting and throwing materials. Stability, reduce loss, reduce the difficulty of interception; ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 