Low-energy-consumption removal method of quinoline insolubles in asphalt
A low-energy-consumption, asphalt technology, applied in the processing of tar asphalt/petroleum asphalt/natural asphalt, processing tar asphalt/petroleum asphalt/natural asphalt by distillation, and processing tar asphalt/petroleum asphalt/natural asphalt by selective extraction, etc. Solve the problems of long settling time, increase product cost, and increase energy consumption, and achieve the effect of saving process time and reducing energy consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] (1) Mix 100g polyaluminum chloride (solid, GB / T 22627-2008), 1000g deionized water, and 8000g ethylene glycol at room temperature, and stir for 2 hours to obtain a flocculation solution;
[0013] (2) Add 2000g of washing oil (GB / T 24217-2009) to 1000g of asphalt to be treated (the mass content of quinoline insoluble matter is 4.7%), raise the temperature to 95°C, stir at constant temperature for 1 hour, and obtain the asphalt / washing oil mixture;
[0014] (3) Add 600g of flocculation solution to the above asphalt / washing oil mixture, stir at 105°C for 1 hour to obtain a primary treatment solution, centrifuge the treatment solution at a speed of 2000r / min for 45min and then separate into layers, the upper layer is the secondary treatment solution , the lower layer is a viscous black liquid enriched with quinoline insolubles, this liquid can be used as a raw material in other fields, such as the production of binders;
[0015] (4) Ethylene glycol is distilled from the sec...
Embodiment 2
[0017] (1) Mix 150g polyaluminum chloride, 700g deionized water, and 5500g propylene glycol at room temperature, and stir for 2 hours to obtain a flocculation solution;
[0018] (2) Add 1,500g of washing oil to 1,000g of asphalt to be treated, heat up to 80°C, stir at a constant temperature for 1.5h, and obtain the asphalt / washing oil mixture;
[0019] (3) Add 300g of flocculation solution to the above asphalt / washing oil mixture, stir at 95°C for 1.5h to obtain a primary treatment solution, centrifuge the treatment solution at a speed of 2000r / min for 30min and then separate into layers, the upper layer is for secondary treatment liquid, the lower layer is a viscous black liquid enriched with quinoline insolubles, this liquid can be used as a raw material in other fields, such as the production of binders;
[0020] (4) Distill the propylene glycol from the secondary treatment liquid at 190-200°C, distill the washing oil at 280-300°C, recycle the propylene glycol and washing o...
Embodiment 3
[0022] (1) Mix 100g polyaluminum chloride, 1500g deionized water, and 10000g propylene glycol at room temperature, and stir for 2 hours to obtain a flocculation solution;
[0023] (2) Add 2500g of washing oil to 1000g of asphalt to be treated, raise the temperature to 95°C and stir at constant temperature for 1.5h to obtain the asphalt / washing oil mixture;
[0024] (3) Add 500g of flocculation solution to the above asphalt / washing oil mixture, stir at 105°C for 0.5h to obtain a primary treatment solution, centrifuge the treatment solution at a speed of 1500r / min for 15min and then separate into layers, the upper layer is for secondary treatment liquid, the lower layer is a viscous black liquid enriched with quinoline insolubles, this liquid can be used as a raw material in other fields, such as the production of binders;
[0025] (4) Distill the propylene glycol from the secondary treatment liquid at 190-200°C, distill the washing oil at 280-300°C, recycle the propylene glycol...
PUM