Chemical modified rubber asphalt with stable performance and preparation method thereof
A chemical modification, rubber asphalt technology, applied in building components, building insulation materials, construction and other directions, can solve the problems of softening point and viscosity attenuation, high temperature performance without considering the attenuation of rubber asphalt performance indicators, etc., to achieve high temperature performance improvement, The preparation process is simple and feasible, and the effect of improving compatibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] The chemically modified rubber asphalt of this embodiment is prepared by adding 100 parts of road petroleum asphalt to 20 parts of modified rubber powder with a mesh number of 30 to 40 in parts by weight; and the modified rubber powder is prepared by the following weight: The composition of parts ratio: absolute ethanol: modified water glass with a modulus of 1.2: rubber powder=80:10:10.
[0030] Concrete preparation process is as follows:
[0031] (1) Preparation of modified rubber powder:
[0032] First, the modified water glass with a modulus of 1.2 is prepared by using industrial sodium water glass and industrial caustic soda;
[0033] Then, adding absolute ethanol, modified water glass and rubber powder into the container in sequence according to the weight ratio of each component for mixing, and stirring the mixed raw materials in a water bath at 70° C. for 2 hours;
[0034] Finally, after the stirring, the rubber powder was filtered out, and aged at room temper...
Embodiment 2
[0039]The chemically modified rubber asphalt of this embodiment is prepared by adding 100 parts of road petroleum asphalt to 20 parts of modified rubber powder with a mesh number of 40 to 50 in parts by weight; and the modified rubber powder is prepared by the following weight: The composition of parts ratio: absolute ethanol: modified water glass with a modulus of 1.6: rubber powder=75:15:10.
[0040] Concrete preparation process is as follows:
[0041] (1) Preparation of modified rubber powder:
[0042] First, the modified water glass with a modulus of 1.6 is prepared by using industrial sodium water glass and industrial caustic soda;
[0043] Then, add absolute ethanol, modified water glass and rubber powder into the container in sequence according to the weight ratio of each component for mixing, and stir the mixed raw materials in a water bath at 80° C. for 2 hours;
[0044] Finally, after the stirring, the rubber powder was filtered out, and aged at room temperature fo...
Embodiment 3
[0049] The chemically modified rubber asphalt of this embodiment is prepared by adding 100 parts of road petroleum asphalt to 20 parts of modified rubber powder with a mesh number of 50 to 60 in parts by weight; and the modified rubber powder consists of the following weight The composition of parts ratio: absolute ethanol: modified water glass with a modulus of 1.8: rubber powder=75:10:15.
[0050] Concrete preparation process is as follows:
[0051] (1) Preparation of modified rubber powder:
[0052] First, the modified water glass with a modulus of 1.8 is prepared by using industrial sodium water glass and industrial caustic soda;
[0053] Then, add absolute ethanol, modified water glass and rubber powder into the container in sequence according to the weight ratio of each component for mixing, and stir the mixed raw materials in a water bath at 80° C. for 2 hours;
[0054] Finally, after the stirring, the rubber powder was filtered out, aged at room temperature for 12 ho...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Extensibility | aaaaa | aaaaa |
| Softening point | aaaaa | aaaaa |
| Extensibility | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More