Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method

A technology of steel pipe arch bridges and construction methods, which can be applied to arch bridges, bridge forms, bridges, etc., and can solve the problem of complex stress on the tower buckle of the cable-stayed buckle-hanging suspension method, high water navigation capacity requirements, and structural instability during the rotation stage. problem, to achieve the effect of reducing cumbersome calculation and equipment installation, cable force adjustment and control flexibility, and large tensioning capacity

Inactive Publication Date: 2013-12-11
中天交通建设投资集团有限公司
View PDF7 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The calculation of cable hoisting is complex and requires a lot of steel. The construction equipment includes cable crane tower, cable crane main cable, hoisting cable, traction cable, buckle cable, working cable, wind cable, traverse cable, sports car, cable saddle and anchors, etc., have high requirements for construction equipment; the construction method that needs to erect supports during the hoisting process requires good geological conditions under the bridge and high foundation bearing capacity, and the erected supports must also undergo strict calculations. The river channel is closed to navigation during the period from erection of the bracket to the removal of the bracket; the swivel device and traction device of the swivel construction are time-consuming and labor-intensive, it is difficult to determine a reasonable buckle cable force, and the structure is prone to overall instability during the swivel stage; The requirements for water navigation are relatively high, and it is difficult to accurately control the line shape of a single arch rib when it is dropped during hoisting, and there is a risk of irreparable distortion and deformation of the arch rib. There are disadvantages that the inelastic deformation is difficult to control, the construction period of the buckle-hanging tower is long, there are many nodes, and the installation quality is difficult to control
Such as the "200910036700.5" patent, this patent also uses a cable tower, the disadvantage of using a cable tower is that the calculation is complicated, more steel is required, and there are high requirements for hoisting equipment, and the construction period is relatively long

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method
  • Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method
  • Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] Take the 5# arch rib of Wenhui bridge reconstruction project in Liuzhou City, Guangxi Province as an example to specifically illustrate the construction method of the present invention below.

[0039] Wenhui Bridge is located in the downtown area of ​​Liuzhou, and it is the main channel connecting the north and south of Liuzhou City. The reconstruction project of Wenhui Bridge is to build a new sister bridge downstream of the original bridge, which has the same appearance and the same structure as the original bridge. The superstructure includes 3-hole L=108m center-supported dumbbell-shaped concrete-filled steel pipe arches and two sides L=62m top-supported reinforced concrete box-rib arches, which are super-large bridges. Main arch rib and horizontal connection: mid-supporting concrete-filled steel tube arch axis coefficient: m=1.347, net span of 108 meters, net rise height of 27 meters, rise-span ratio of f / 1=1 / 4, dumbbell-shaped section height of 2.2 The diameter o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a steel tube concrete arch bridge hoisting construction method, belongs to the technical field of bridge construction, and discloses a steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method. The method includes the following steps of 1, arch rib pre-assembly, 2, ground anchor arrangement, 3, single-floating-crane transportation, 4, single-edge segment adjustment to be close to design angles through a floating crane, 5, buckling system installation, 6, repetition of the steps 3, 4 and 5 and installation of the other section of a single-edge segment, 7, double-floating-crane transportation, and 8, folding and welding. The method improves production efficiency, accelerates construction, saves engineering cost, and guarantees arch rib installation quality.

Description

technical field [0001] The invention relates to a hoisting construction method for a steel tube concrete arch bridge, and belongs to the technical field of bridge construction. Background technique [0002] One of the most important procedures in the construction of the arch rib of a concrete-filled steel tube arch bridge is the installation of the arch rib. At present, the main installation methods at home and abroad are: cable hoisting without bracket; cable hoisting with few brackets; floating hoisting with whole arch rib or few brackets; Wait. The calculation of cable hoisting is complex and requires a lot of steel. The construction equipment includes cable crane tower, cable crane main cable, hoisting cable, traction cable, buckle cable, working cable, wind cable, traverse cable, sports car, cable saddle and anchors, etc., have high requirements for construction equipment; the construction method that needs to erect supports during the hoisting process requires good g...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D4/00
Inventor 包强锋李颖李浩然王劲松姜希梅
Owner 中天交通建设投资集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products