Segmented integrated airtight heat-preserving steel silo and manufacturing method
A technology of silos and steel plates, applied in the field of large-scale long-term storage granaries
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] A segmented integrated airtight thermal insulation steel silo, which consists of: a foundation 1, a silo connected to the foundation, the silo includes a silo main body 2 and an insulation layer 3, and the silo main body includes a silo roof 21 and the warehouse wall 22, first weld the completed upper part of the warehouse wall and the warehouse roof, and then continue to integrate the lower warehouse wall in sections, and finally complete the whole warehouse body and combine it with the warehouse roof. And connected to form the main body of the warehouse;
[0047] The silo roof is a steel plate welded into a conical shell or a spherical shell, and the silo wall includes a silo column 23? and the warehouse wall plate 24, between the warehouse wall boards, between the warehouse columns, and between the warehouse wall panels and the warehouse column columns are connected by bolts, and are integrated through colloidal sealing, etc. After that, the silo wall is formed....
Embodiment 2
[0049] In the segmented integrated airtight thermal insulation steel silo described in Example 1, the thermal insulation layer is fixed on the main body of the warehouse, and the thermal insulation layer includes a roof thermal insulation layer and a warehouse wall thermal insulation layer. The wall insulation layer is on the outside of the warehouse wall, and the outside of the warehouse wall insulation layer has an outer plate 5 .
Embodiment 3
[0051] In the segmented integrated airtight insulation steel silo described in Embodiment 1 or 2, there is a stepped shoulder 41 between the nut of the bolt and the bolt column, and the rubber strip is embedded between the stepped shoulder and the silo wall After the bolts are connected, the gap between the wall panels of the warehouse and the joint formed by the installation are formed by rubber strips to form a sealed integrated sealing structure.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 