Automatic glued rail process parameter control system and method
A technology of automatic control system and process parameters, applied in the direction of using electric mode for temperature control, etc., can solve the problems of different old and new heating boxes, affecting the quality of glued joints, lack of monitoring methods, etc., so as to reduce the influence of human factors and improve products. The effect of quality, simple operation process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Such as figure 1 As shown, the automatic control system of the process parameters of the glued rail of the present invention includes an information input unit 1 , an information collection and feedback unit 2 and an information output unit 3 .
[0020] The information input unit 1 is used for inputting process information and product information, wherein the process information includes temperature and time; the product information includes rail length, rail type, rubber sheet manufacturer and other information.
[0021] The information collection and feedback unit 2 is used to monitor the temperature and holding time of all heating boxes, so that operators can observe the heating status of all production lines in real time during the holding time of rail bonding, deal with abnormal situations in time, and automatically record the heating temperatures of all production lines Curve to ensure that the product processing process is consistent with the process.
[0022] T...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 