A construction method of cast-in-place terrazzo ground surface
A construction method, terrazzo technology, applied in the direction of construction, building structure, building materials, etc., can solve the problems of surface layer hardness, insufficient density, obstacles to daily sanitation and cleaning, and insufficient edge grinding, etc., to achieve easy construction , The effect of reducing the difficulty of hygiene management and reducing maintenance and cleaning costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Embodiment 1: A construction method of cast-in-place terrazzo ground, (1) base treatment; (2) watering and moistening; (3) ground bottom ash punching ribs; (4) laying bottom ash; ; (6) inlaid partition strip; (7) brushing the bonding layer; (8) spreading stone slurry; (9) rolling compaction and spreading and flattening; (10) trial grinding; (11) coarse grinding; ( 12) fine grinding; it also includes: (13) concrete curing agent; (14) fine grinding; (15) terrazzo surface crystal plane treatment; wherein,
[0016] (8) Spreading stone slurry: In order to make the cast-in-place terrazzo ground be ground and polished with zero dead ends, adjustments are made in the construction process. The pipelines passing through the ground are installed after the construction of the ground is completed. Reserve the holes for sealing, turn over the 300mm high wall from the ground and do not plaster for the time being, so that the grinder can be better polished in place, and after the groun...
Embodiment 2
[0023] Example 2: A university life science laboratory building and annex building project, one basement floor, twelve floors above ground, four annex buildings, frame shear wall structure, with a total construction area of 73129㎡. The project was constructed using the new cast-in-place terrazzo ground construction method in Example 1, which saved a total cost of 896,000 yuan. Due to the reduction of pickling and waxing processes, the construction period was shortened by about 40 days, which effectively solved the possible problems in the construction of terrazzo ground. Some quality problems, and achieved good social and economic benefits.
Embodiment 3
[0024] Example 3: The 1# student apartment building project of a university has four floors above the ground, frame shear wall structure, and a total construction area of 12,426 square meters. The project is constructed using the new cast-in-place terrazzo ground construction method in Example 1, saving a total cost of 246,000 yuan , due to the reduction of pickling and waxing processes, the construction period is shortened by about 20 days, and it has won unanimous praise from the school and students during use, and has achieved good social and economic benefits.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com