Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support

A technology for shield tunnels and subway stations, which is applied in tunnels, tunnel linings, and earth-moving drilling and mining, etc., can solve the problems of construction interference between section tunnels and stations, large-plane underground space, and difficulty in layout of double-track tunnels, and achieve flexible construction planning. , The effect of small expansion and excavation works, and the effect of reducing risks

Inactive Publication Date: 2015-05-20
BEIJING MUNICIPAL CONSTR +3
View PDF7 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) It is difficult to coordinate the construction of the section shield and the station
[0004] At present, the conventional shield interval tunnels are in the form of two holes and two lines, and the stations are generally constructed by the open cut (cover excavation) method, which has the problem of frequent starting, receiving and U-turning of shield tunnels, and the construction of interval tunnels and stations interferes with each other, restrict

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support
  • Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support
  • Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] Please refer to the attached figure 1 to attach Figure 12 Shown, the present invention is a kind of method that uses pile arch wall to support expanding and excavating large-diameter shield tunnel to build subway station, and it comprises the following steps:

[0046] 1), such as figure 1 As shown, after the large-diameter shield tunneling with a diameter of 10.2m passes through the station, the station end air duct is used as the construction channel, and the bottom longitudinal beam 2, the middle partition wall 3 and the roof of the station structure are constructed in the large-diameter shield tunnel 1. Longitudinal beam 4, and temporary steel support 7 is erected in shield tunnel 1. The longitudinal beams 2 and 4 are poured with C50 reinforced concrete, and are in direct contact with the top segment 5 and the bottom segment 6 .

[0047] Since the longitudinal beams and segments may be subjected to eccentric loads during the excavation and buckle arch stage of th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for expanding excavation of a large-diameter shield tunnel for subway station construction through a pile arch wall support. The method comprises the steps that a single-hole double-track tunnel of a station portion is used as a part of the station structure, pipe segment structures at the bottom and the top of a shield are reserved, and a bottom longitudinal beam, a middle partition wall and a top longitudinal beam of the station structure are constructed; the remaining station structures on the two sides of the shield tunnel are formed through expanding excavation, an air flue at the end of the station is used as a working plane, expanding excavation is carried out on the two sides of the large-diameter shield tunnel by the adoption of a hole pile method, the pipe segment structures on the two sides of the shield are removed in the expanding excavation process, and meanwhile the connection measure between a cast-in-place structure and the remaining pipe segments is taken to form the single-layer double-span side platform subway station. The method for expanding excavation of the large-diameter shield tunnel for subway station construction through the pile arch wall support has the advantages of being definite in stress, reasonable in conversion, convenient to construct and the like.

Description

【Technical field】 [0001] The invention relates to a construction method of a subway station, in particular to a method for constructing a subway station by using a pile arch wall to support and expand and excavate a large-diameter shield tunnel, and belongs to the technical field of rail transit engineering. 【Background technique】 [0002] The shield tunneling method is widely used in subway tunnel construction because of its advantages of high construction efficiency and good effect in controlling ground settlement. The construction of subway tunnels using the shield method and the construction of stations using the open (cover) excavation method are a major mode of subway construction at present. The existing environment will be more complex, and this construction mode faces severe challenges, which are mainly reflected in the following aspects. [0003] (1) It is difficult to coordinate the construction of the section shield and the station [0004] At present, the conv...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/06E21D11/08E21D11/10
CPCE21D9/06E21D11/003E21D11/08E21D11/10
Inventor 孔恒宫本福汪挺李振东颜莓郑昊曾德光王全贤杨冬梅马晓卫钟德文庞振勇张冰黄齐武李爱民张彦李斌丁德云王焰华
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products