Method for quickly breeding sand scutellaria baicalensis in saline-alkali soil
A technology for beach scutellaria and saline-alkali land, applied in botany equipment and methods, horticulture, plant cultivation, etc., can solve the problems of no formation system, no artificial cultivation of beach scutellaria, etc., to improve performance, facilitate survival and growth, and seedling survival rate high effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0038]The method of rapidly propagating Scutellaria baicalensis on saline-alkali soil by burying rhizomes is carried out in March, including the following steps:
[0039] (1) Soil treatment
[0040] S10, digging drainage ditches: the salt content of the soil at a depth of 0-10 cm in the test field is 0.2%, and polyethylene perforated corrugated pipes are laid at 60 cm underground, and the laying distance of polyethylene perforated corrugated pipes is 10 m; on the ground and polyethylene perforated corrugated pipes A drainage ditch is set every 25m in the vertical direction of the bellows, the ditch depth is 0.8m, and the ditch width is 1m;
[0041] S20, land fertilization leveling and furrowing: finely prepare the land for planting, apply basal fertilizer to the plot, and spread 500 kg of organic fertilizer, 45 kg of superphosphate, 8 kg of potassium sulfate, and 600 kg of peat soil per mu during land preparation; after that, deep plow the soil by 20 cm, Level the land, and t...
Embodiment 2
[0046] The method of rapidly propagating Scutellaria baicalensis on saline-alkali soil by burying rhizomes is carried out in March, including the following steps:
[0047] (1) Soil treatment
[0048] S10. Digging drainage ditches: the salt content of the soil at a depth of 0-10 cm in the test field is 0.4%, and polyethylene perforated corrugated pipes are laid at 70 cm underground, and the laying distance of polyethylene perforated corrugated pipes is 9 m; on the ground and polyethylene perforated corrugated pipes A drainage ditch is set every 23m in the vertical direction of the bellows, the ditch depth is 0.9m, and the ditch width is 1.1m;
[0049] S15. Fresh water desalination: Before leveling the land, perform fresh water desalination treatment, specifically, 15 days before burying the rhizomes, use fresh water to perform fresh water desalination treatment on the saline-alkali land, and the fresh water consumption is 120m 3 / mu.
[0050] S20, land fertilization leveling ...
Embodiment 3
[0055] The method of rapidly propagating Scutellaria baicalensis on saline-alkali soil by burying rhizomes is carried out in March, including the following steps:
[0056] (1) Soil treatment
[0057] S10. Digging drainage ditches: the salt content of the soil at a depth of 0-10 cm in the test field is 0.6%, and polyethylene perforated corrugated pipes are laid at 80 cm underground, and the laying distance of polyethylene perforated corrugated pipes is 8 m; A drainage ditch is set every 20m in the vertical direction of the bellows, with a depth of 1m and a width of 1.2m;
[0058] S15. Fresh water pressure salt treatment: before leveling the land, perform fresh water pressure salt treatment, specifically, 20 days before burying the rhizomes, use fresh water to perform fresh water pressure salt treatment on the saline-alkali land, and the fresh water consumption is 150m 3 / mu.
[0059] S20, land fertilization leveling and making furrows: finely prepare the land for planting, ap...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com