An assembly method of a small steel pipe inside an air-conditioning liquid reservoir
An assembly method and technology of accumulator, applied in refrigeration and liquefaction, lighting and heating equipment, refrigeration components, etc., can solve the problem that the connection between the body and the steel pipe is easy to loosen, the shape of the welded part is not ideal, and the welding quality does not matter. It can achieve the effect of good welding surface quality, easy to master and improve welding quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] (1) Positioning steel pipe: such as figure 2 As shown, take out the small steel pipe, fix one end of a positioning rod through the small steel pipe, and then put the larger diameter end of the small steel pipe on the conical liquid outlet on the air conditioner accumulator, and the other end of the positioning rod Passing through the top of the air conditioner accumulator, the positioning rod includes two sections, one of which has a larger diameter and can be sleeved on the larger diameter end of the small steel pipe, and the other has a smaller diameter and can be sleeved on the air conditioner accumulator. , the positioning rod extends to the outside of the top of the air conditioner accumulator, and the length of the excess part is 4cm;
[0022] (2) Pre-fixing: After pre-fixing in step (1), use a resistance welding machine to perform spot welding at the connection between the small steel pipe and the conical liquid outlet of the air-conditioning accumulator, and th...
Embodiment 2
[0025] Example 2: the rest are the same as Example 1, the difference is that in the step (2), the number of electric welding parts is 4; in the step (3), the control welding current is 185A, and the argon gas flow is 7L / min, the waiting time after the welding is completed is 13s; in the step (4), the annealing temperature is controlled to be 346° C., and the return time is 2.5h.
Embodiment 3
[0026] Example 3: the rest are the same as Example 1, the difference is that in the step (2), the number of electric welding parts is 3; in the step (3), the control welding current is 187A, and the argon gas flow is 8L / min, the waiting time after the welding is completed is 14s; in the step (4), the annealing temperature is controlled to be 352° C., and the return time is 3h.
[0027] After the above process steps, take out the sample, to be tested:
[0028]
[0029] It can be seen from the above data that the assembled air-conditioning accumulator has good welding quality, no welding defects, and excellent sealing performance. All three samples are qualified, and the pass rate is 100%, which fully meets the requirements for use. Simple, highly maneuverable and efficient, saving the cost of the enterprise.
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims