Road pavement runoff sewage intercepting wetland zone and construction method thereof
A technology of road pavement and construction method, which is applied in the field of environmental engineering to achieve the effect of slowing down the flow rate of runoff and reducing surface runoff pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] A wetland construction method for road non-point source pollution control. The wetland system design and construction is carried out on the buffer zone along the road and lake side of the lake. The construction process flow chart is as follows figure 1 As shown, the specific steps are as follows:
[0031] (1) In the buffer zone on the side of the lake along the road, the emergent plant pond 1 is first constructed as the first unit of road surface runoff treatment, and the runoff rainfall of the 20-year rainstorm in the service road section is 2000m 3 . The emergent plant pond 1 shape is built according to the topography of the site, and the area of the emergent plant pond 1 in the present embodiment is 2500m 2 , the depth of the pond is designed to be 1.5m in the middle area and about 0.5m in the edge area. It is a gentle slope terrain, and the total runoff regulation and storage is about 3000m 3 . A clay anti-seepage layer is laid on the bottom of the pond, and 30...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com