A double-layer paved, asphalt pavement technology, applied in the direction of on-site coagulation pavement, roads, roads, etc., can solve the problems of decreased skid resistance, pavement aging, pockmarked surface, etc., to increase the clear height, improve the Adhesion, convenient construction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] The AC-13 pavement is selected, and the original pavement detection conditions are that the structure depth is 0.5mm, the friction pendulum value is 45BPN, and the water seepage coefficient is 47mL / min.
[0024] Under the temperature condition of 30°C, the construction process is as follows: Step 1) The bottom layer is to mix the components of the epoxy asphalt adhesive material according to the requirements, and then spray it evenly on the asphalt pavement with a certain pressure, and spread a layer evenly at the same time fine sand. Step 2) The surface layer is to cover the surface with a layer according to the method of step 1) after the bottom layer is cured to form a waterproof and anti-skid protective layer.
[0025] The amount of epoxy asphalt bonding material used for the bottom layer is controlled at 0.3kg / ㎡, and the amount of fine sand spread is 0.1kg / ㎡.
[0026] The amount of epoxy asphalt bonding material used for the surface layer is controlled at 0.2kg / ㎡,...
Embodiment 2
[0029] The AC-13 pavement is selected, and the original pavement detection conditions are that the structure depth is 0.5mm, the friction pendulum value is 45BPN, and the water seepage coefficient is 47mL / min.
[0030] Under the temperature condition of 30°C, the construction process is as follows: Step 1) The bottom layer is to mix the components of the epoxy asphalt adhesive material according to the requirements, and then spray it evenly on the asphalt pavement with a certain pressure, and spread a layer evenly at the same time fine sand. Step 2) The surface layer is to cover the surface with a layer according to the method of step 1) after the bottom layer is cured to form a waterproof and anti-skid protective layer.
[0031] The amount of epoxy asphalt bonding material used for the bottom layer is controlled at 0.35kg / ㎡, and the amount of fine sand spread is 0.2kg / ㎡.
[0032] The amount of epoxy asphalt bonding material used for the surface layer is controlled at 0.2kg / ㎡...
Embodiment 3
[0035] The AC-13 pavement is selected, and the original pavement detection conditions are that the structure depth is 0.5mm, the friction pendulum value is 45BPN, and the water seepage coefficient is 47mL / min.
[0036] Under the temperature condition of 30°C, the construction process is as follows: Step 1) The bottom layer is to mix the components of the epoxy asphalt adhesive material according to the requirements, and then spray it evenly on the asphalt pavement with a certain pressure, and spread a layer evenly at the same time fine sand. Step 2) The surface layer is to cover the surface with a layer according to the method of step 1) after the bottom layer is cured to form a waterproof and anti-skid protective layer.
[0037] The amount of epoxy asphalt bonding material used for the bottom layer is controlled at 0.4kg / ㎡, and the amount of fine sand spread is 0.3kg / ㎡.
[0038] The amount of epoxy asphalt bonding material used for the surface layer is controlled at 0.25kg / ㎡...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com