Continuous transverse movement type construction method for long-span cable crane
A construction method and traverse technology, applied in the direction of erecting/assembling bridges, bridges, buildings, etc., can solve the problems of high potential safety hazards, cumbersome operation, low work efficiency, etc., to reduce friction, simple operation and cost saving Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention designs a large-span cable crane continuous traverse construction method with a span of 548.5m. to combine figure 1 , the large-span cable crane continuous traverse construction method of the present invention comprises the following steps:
[0040] Step 1, apply a lubricating substance on the top surface of the slideway beam 1, and open a through hole for fixing the cable saddle 2 at the web position of the slideway beam 1;
[0041] In the specific construction process, existing lubricating substances such as butter and lubricating oil can be used, and the preferred lubricating substance is butter;
[0042] Step 2, opening four through holes at the bottom beam position of the cable saddle 2;
[0043] In this embodiment, after opening four through holes at the bottom beam position of the cable saddle 2 in step 2, a stiffening plate for preventing tension deformation is welded at the positions where the through holes are opened.
[0044] Step 3. ...