Construction method of prefabricated floating slab ballast bed
A construction method and floating plate technology, which are applied in the directions of roads, tracks, ballast layers, etc., to achieve the effects of reducing production costs, saving a lot of time, and reducing construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0044] see figure 1 , 2 , the floating track bed structure of the present invention includes a prefabricated track bed slab 1, a plurality of through holes are arranged on the prefabricated track bed slab 1, and an outer sleeve 3 is fixedly installed in the through holes or prefabricated together with the track bed to form an outer sleeve 3. On the foundation 6 of the bed board 1, some pits 7 are preset at the position corresponding to at least part of the vibration isolator 2, which are used to place the mortar bag 5, and the method of placing the mortar bag into the pit 7 can be, on the road bed board (1) according to During the process, the mortar bag (5) is inserted into the pit along with the positioning of the vibration isolator (2), or the mortar bag (5) is first placed in the pit. Among them, the mortar bag 5 has an opening. During the construction process, the mortar bag 5 can be filled with mortar material, and after curing, it can be used as a support for the vibra...
Embodiment approach 2
[0063] refer to image 3 , 4 , the floating track bed slab of the second embodiment of the present invention has the same general structure as that of the first embodiment, except that an isolation plate is installed between the vibration isolator 2 and the mortar bag.
[0064] The specific construction process of this embodiment is:
[0065] 1) When pouring the foundation 6, use a mold to reserve a pit 7 with a certain diameter and depth on at least part of the intended installation position of the vibration isolator 2. Preferably, the diameter is about 1.5 times the diameter of the vibration isolator, and the depth is quite large at 3cm.
[0066] 2) The vibration isolator 2 is connected and positioned with the prefabricated track bed 1 according to the normal working state, and an isolation plate is installed at the lower part of the vibration isolator 2 .
[0067] 3) Place the mortar bag 5 directly in the pit, or place the mortar bag 5 in the pit 7 along with the vibrati...
PUM