Oil exploiting method conducted through horizontal infilled well in cooperation with underground authigenic mixed-phase thermal fluid
A self-generated miscible heat and horizontal well technology, which is applied in the direction of production fluid, wellbore/well components, earthwork drilling and production, etc., can solve problems such as difficult production, difficult economic benefits, ultimate recovery rate, and little increase in oil recovery rate, etc. Achieve the effect of increasing the available reserves, flexible application, and reducing the corrosion of steam to the wellbore
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] In a block of an oilfield, the depth of the oil layer is 1850 meters, the temperature of the oil layer is 53 degrees Celsius, the thickness of the oil layer is 10 meters, the viscosity of crude oil is 42000 mPas, and the original formation pressure is 18.2 MPa. The horizontal wells are 800 meters apart, and water flooding has been carried out. At present, the water injection pressure is high, the water injection volume is small, and the recoverable reserves in the oil layer are small. The current water injection pressure is 27 MPa, the water injection volume is 30 cubic meters per day, and the current recovery rate is 3.5%.
[0049] Step 1: Arrange infill wells, refer to figure 1 B. image 3 A. The distribution of the intensified horizontal well is opposite to that of the original horizontal well, and the horizontal section of the intensified horizontal well is horizontally aligned with the horizontal section of the original horizontal well, and the distance between th...
Embodiment 2
[0057] In a block of an oilfield, the depth of the oil layer is 2,500 meters, the temperature of the oil layer is 45 degrees Celsius, the thickness of the oil layer is 15 meters, the viscosity of crude oil is 32,000 mPas, and the original formation pressure is 15.6 MPa. Horizontal well spacing is 1000 meters. Water flooding has been carried out, the current water injection pressure is 15 MPa, the water injection volume is 400 cubic meters per day, the current recovery rate is 20%, and the water content of the produced fluid is 90%.
[0058] Step 1: Arrange infill wells, refer to figure 1 E. image 3 C. The intensified horizontal well is distributed in the opposite direction to the original horizontal well. The horizontal section of the intensified horizontal well and the horizontal section of the original horizontal well are distributed in a lateral dislocation, and the heel of the intensified horizontal well is 400 meters in front of the toe of the original horizontal well, ...
Embodiment 3
[0066] In a block of an oilfield, the depth of the oil layer is 2,350 meters, the temperature of the oil layer is 70 degrees Celsius, the thickness of the oil layer is 13 meters, the viscosity of crude oil is 86,000 mPas, the original formation pressure is 22 MPa, the well layout method is a horizontal well pattern, and the length of the horizontal section is 900 meters. The horizontal well spacing is 600 meters. Due to the high viscosity of the crude oil in the formation, the crude oil does not have fluidity in the oil layer. The current production belongs to primary oil production.
[0067] Step 1: Arrange infill wells, refer to figure 1 F. image 3 B. The distribution of the intensified horizontal well is opposite to that of the original horizontal well, the horizontal section of the intensified horizontal well and the horizontal section of the original horizontal well are distributed in a lateral dislocation, and the heel of the intensified horizontal well is located 300 m...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


