A connection pipeline well and construction method for inclined ore body
A construction method and technology for ore bodies, which are applied in mining equipment, earth-moving drilling, tunnels, etc., can solve the problems of poor safety conditions, endanger the personal safety of operators, and low level of mechanization, so as to reduce construction operation time and simplify construction technology. , the effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The technical scheme of the present invention will be further described below in conjunction with the accompanying drawings, but the required protection scope is not limited to the description;
[0026] The invention provides a connecting pipeline shaft and a construction method for inclined ore bodies, such as figure 1 As shown, it includes upper tunnel 1, lower tunnel 2, vertical tunnel 3 and lower tunnel 4, one end of vertical tunnel 3 communicates with upper tunnel 1, and the other end of vertical tunnel 3 communicates with one end of lower tunnel 4 , the other end of the lower tunnel 4 communicates with the lower tunnel 2 . By using the trackless drilling jumbo and the raise drilling rig to excavate the pipeline shaft, the pipeline shaft is no longer parallel to the side of the ore body slope, but consists of vertical channels and several horizontal channels. Drilling and reaming of straight tunnels and other technological operations, while the trackless rock dril...
PUM