Embodiment 1
[0037] This embodiment discloses a threaded reinforced concrete prefabricated pile suitable for permafrost regions, including: a prefabricated threaded reinforced concrete hollow pile 1 and cooling and heat pipes 2 implanted in the permafrost foundation.
[0038] see figure 1 , figure 2 , Figure 6 and Figure 7 , the prefabricated threaded reinforced concrete hollow pile 1 includes a pile body 101 and a pile tip 102 . The pile point 102 as a whole is a cone or a truncated cone. The top surface of the pile point 102 is in contact with the bottom surface of the pile body 101 . The side of the pile tip 102 is provided with spiral blades. The pile body 101 includes an upper pile 1011 and a lower pile 1012 . The lower pile 1012 is disposed on the bottom of the upper pile 1011 . The upper pile 1011 and the lower pile 1012 are integrated. The pile body 101 has a pile body main reinforcement 10141 and a pile body spiral stirrup 10142. The main reinforcement 10141 of the pil...
Embodiment 2
[0045] This embodiment discloses a method for manufacturing the threaded reinforced concrete prefabricated pile described in Embodiment 1, comprising the following steps:
[0046] 1) Prefabricated threaded reinforced concrete hollow pile 1 is manufactured in the factory according to the designed pile body size, reinforcement arrangement and concrete strength requirements. According to the design structure and size requirements, the shell, tube core and working medium of the refrigeration heat pipe 2 are manufactured in the factory, and the solar semiconductor refrigeration device 6 is manufactured in the factory according to the size and power requirements of the condensation section II203.
[0047] 2) At the determined foundation pile position, use a small-hole drilling machine to construct the pile-sinking guide hole, and use the auger drilling method to sink the prepared prefabricated threaded reinforced concrete hollow pile 1 into the permafrost foundation according to the ...