A reinforced concrete prefabricated pile suitable for permafrost regions and its manufacturing method
A reinforced concrete and prefabricated pile technology, which is applied in the operation mode of the machine, the refrigerator, the sheet pile wall, etc., can solve the problems such as the delay of the construction time of the superstructure, the lack of a solution method, and the reduction of the bearing capacity of the foundation soil.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] This embodiment discloses a reinforced concrete prefabricated pile suitable for permafrost regions, including: a prefabricated reinforced concrete hollow pile 1 and a cooling heat pipe 2 implanted in a permafrost foundation.
[0034] see figure 1 , figure 2 with Image 6 , the prefabricated reinforced concrete hollow pile 1 includes a pile body 101 and a pile tip 102 . The pile body 101 includes an upper pile 1011 and a lower pile 1012 . The lower pile 1012 is disposed on the bottom of the upper pile 1011 . The upper pile 1011 and the lower pile 1012 are integrated. The pile body 101 has a pile body main reinforcement 10141 and a pile body spiral stirrup 10142. The main reinforcement 10141 of the pile body and the spiral stirrup 10142 of the pile body together form a reinforcement cage 1014 .
[0035] The outer wall of the lower pile 1012 has a plurality of small heat conduction holes 10121 . The small heat conduction holes 10121 are distributed along the radial...
Embodiment 2
[0041] This embodiment discloses a method for manufacturing the reinforced concrete prefabricated pile described in Embodiment 1, comprising the following steps:
[0042] 1) According to the designed pile body size, reinforcement arrangement and concrete strength requirements, the prefabricated reinforced concrete hollow pile 1 is manufactured in the factory. According to the design structure and size requirements, the shell, tube core and working medium of the refrigeration heat pipe 2 are manufactured in the factory, and the solar semiconductor refrigeration device 6 is manufactured in the factory according to the size and power requirements of the condensation section II203.
[0043] 2) Pile sinking construction. The prepared prefabricated reinforced concrete hollow pile 1 is sunk into the permafrost foundation according to the designed foundation pile position and the depth of penetration by using the driving method or the pressing method. When the length of the single-se...