An auxiliary gravity and steam technology, applied in the direction of earthwork drilling, wellbore/well components, production fluid, etc., can solve the problems of long start-up time, high cost, etc., to increase the widening speed, expand the sweep radius, improve oil recovery efficiency and oil recovery volume effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0042] The SAGD fast start method provided in this embodiment includes the following specific steps:
[0043] S1, the steam injection well and the production well are preheated by steam injection cycle at the same time, and the cycle time is 25 days.
[0044] S2, inject solvent into the long oil pipe and short oil pipe of steam injection well and production well at the same time, the solvent type is a mixture of xylene and surfactant (the ratio is 100:1, and the type of surfactant is carbon chain as C 12-14 Alkyl glycoside APG1214); the total injection rate of single-well solvent in the steam injection well and the production well is 120 tons / day, the injection rate ratio between the long tubing and the short tubing is 1:1, and the injection pressure reaches the fracture pressure of the reservoir after 0.2Mpa. Note (the depth of the oil layer is 250m, and the fracture pressure of the oil layer is 5.5Mpa), and the well is stewed for 2 days.
[0045] S3, injecting steam into th...
Embodiment 2
[0051] The SAGD fast start method provided in this embodiment includes the following specific steps:
[0052] S1, the steam injection well and the production well are preheated by steam injection cycle at the same time, and the cycle time is 30 days.
[0053] S2, inject solvent into the steam injection well and the production well long tubing and short tubing at the same time, the solvent type is a mixture of diesel oil and surfactant (the ratio is 1000:1, the surfactant type is carbon chain is C 12-16 Alkyl glycoside APG1216); the total injection rate of single-well solvent for steam injection wells and production wells is 100 tons / day, the injection rate ratio of long tubing and short tubing is 1:1, and the injection pressure reaches 0.2Mpa after the fracture pressure of the reservoir. Note (the depth of the oil layer is 300m, and the fracture pressure of the oil layer is 6.5Mpa), and the well is stewed for 2 days.
[0054] S3, injecting steam into the long tubing and short...
Embodiment 3
[0060]On the basis of Example 1, the weight ratio of xylene and surfactant in the mixture of xylene and surfactant is 50:1, and other conditions are the same as in Example 1. Using the start-up method in Example 3, it takes about 100 days for the start-up phase to reach the thermal communication standard.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com