The Construction Method of Integral Assembled Composite Beam Bridge
A construction method and prefabricated technology, which is applied in the construction field of integrally prefabricated composite girder bridges, can solve problems such as increased construction period, increased amount of steel used, and heavy on-site welding workload.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] Such as figure 1 , figure 2 Shown: the present invention also discloses a steel-concrete composite beam bridge factory construction method used in the construction method of the integrally assembled composite beam bridge, comprising the following steps:
[0039] a. Build the prefabricated bridge slab site at a suitable position in front of the bridge head, and build the steel girder splicing site behind the prefabricated bridge slab site; the front of the bridge head refers to the extension direction of the bridge head, and the side toward the middle of the bridge is opposite to the rear; prefabricated bridge The road slab site and the steel girder splicing site are arranged side by side to form a prefabricated bridge head factory that can build the upper structure of the overall steel-concrete composite beam bridge, which is convenient for continuous construction and improves work efficiency. The construction of the site has different constructions according to differ...