Multi-stage scheduling automation system

A scheduling automation and automatic monitoring technology, applied in control/adjustment systems, general control systems, testing/monitoring control systems, etc., can solve problems such as judgment errors, unprofessional monitoring platform management, and data not refreshing, so as to achieve easy management and maintenance effect

Inactive Publication Date: 2018-06-01
马鞍山佳夫尼电气科技有限公司
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the current power dispatching automation system cannot realize unified dispatching or automatic monitoring of multi-level or multi-site management and control platforms; resulting in the situation that the management of the monitoring platform is not professional enough and the function application is single; the efficiency of system operation and maintenance management is reduced
[0004] In addition, if an abnormal phenomenon occurs in the power dispatching automation system, it will also cause monitoring failure, thereby affecting the operation of the supervised dispatching automation system, reducing the fault tolerance of the system; affecting the safe, stable and economical operation of the power system
[0005] At present, in view of the data not refreshing, abnormal data, communication interruption, and remote control action not responding to the dispatching automation system, the cause of the failure is judged according to the experience of the dispatching personnel. Some existing dispatching automation systems have set up equipment status display screens, but The display only shows the connection relationship and static situation of the existing dispatching automation equipment, which provides a reference for dispatchers to judge the cause of the failure, and cannot dynamically reflect the actual operation of the dispatching automation system equipment
In addition, the speed of finding faults mainly depends on the sensitivity of monitoring personnel to fault phenomena, which is greatly affected by the manual experience of dispatchers, and even makes judgment errors, affecting the normal operation of the power system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-stage scheduling automation system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention.

[0037] combine figure 1 , a multi-level scheduling automation system provided in this embodiment, the multi-level scheduling automation system includes a first-level automatic monitoring module 1, a second-level automatic monitoring module 2, a third-level automatic monitoring module 3 and a fault monitoring module 4;

[0038] The first-level automatic monitoring module 1 transmits data to the second-level automatic monitoring module 2;

[0039] The secondary automatic monitoring module 2 transmits data to the tertiary automatic monitoring module 3 through system integration;

[0040] The three-level automatic monitoring module 3 analyzes and processes the received data;

[0041] The first-level automatic monitoring modu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of automatic instruments and apparatuses, and provides a multi-stage scheduling automation system. The system comprises a first-stage automatic monitoringmodule, a second-stage automatic monitoring module, a third-stage automatic monitoring module and a fault monitoring module. The multi-stage scheduling automation system is designed to realize the data acquisition of different equipment and different acquisition modes. Meanwhile, acquired data are transmitted to a data management center, so that the centralized management of data is realized. Different clients can browse data in respective authority ranges according to the authorities of the clients. As a result, the management and the maintenance of database data are facilitated.

Description

technical field [0001] The invention belongs to the technical field of automation instruments and meters, and in particular relates to a multi-level scheduling automation system. Background technique [0002] The main function of the power dispatching automation system is to complete the collection and processing of on-site power system parameters, and to carry out corresponding control. Its basic structure includes three parts: dispatching center, remote terminal and information transmission channel. Scheduling requires safe and reliable operation of the operating state. [0003] However, the current power dispatching automation system cannot realize unified dispatching or automatic monitoring of multi-level or multi-site management and control platforms; resulting in the situation that the management of the monitoring platform is not professional enough and the function application is single; the efficiency of system operation and maintenance management is reduced. [000...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G05B23/02
CPCG05B23/027
Inventor 孙光明朱祖堂胡诚斌
Owner 马鞍山佳夫尼电气科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products