Construction method of sandy ground hole-forming anti-floating anchor of steel pipe and PVC pipe compound bushing
A technology of PVC pipe and composite casing, which is applied in the direction of foundation structure engineering, sheet pile walls, protective devices, etc., which can solve the problems of inability to guarantee the quality of grouting and the construction quality of anti-floating bolts, the difficulty of forming holes, and the difficulty in ensuring anti-floating Anchor design pullout resistance and other issues, to achieve significant social benefits, solve the anchoring force, the effect of simple construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0047] The steel pipe and PVC pipe composite casing sand geological hole formation anti-floating anchor construction method provided in this embodiment includes the following steps:
[0048] (1) Anchor hole positioning number
[0049] 1 Lay out the anti-floating anchor rod position according to the construction layout plan, and measure the hole position and on-site elevation beforehand, clarify the anchor hole center and anti-floating anchor rod height, and use the total station and level as the measuring instrument; according to the design requirements and the soil Layer conditions, determine the hole position and mark;
[0050] 2 The anchor hole positioning deviation is not more than 20mm, and the verticality deviation is not more than 1.5%;
[0051] (2) Conventional hole drilling machine is in place, steel casing drilling
[0052] 1 Install the anchor hole drilling rig, leveling, adjusting and stabilizing; the working surface should be flat and solid, and the site should ensure the ...
Embodiment 2
[0074] Example 2 Application Example
[0075] (1) Qingdao Taizhou Road No. 15, 17, and 19 Urban Yipin Phase II Project
[0076] 1 Project Overview
[0077] Qingdao Taizhou Road No. 15, 17, and 19 Metropolis Yipin Phase II project is located at No. 15, 17, and 19 Taizhou Road, Shinan District, Qingdao, with a total construction area of 72,203.16 square meters. The supporting layer of the foundation of the project is strongly weathered rock, and also contains some lamprophyre. Due to the temporary suspension of excavation to the strongly weathered rock, the surface layer of the strongly weathered rock is weathered and frozen, and all the wind turns into a sand layer with a depth of 0.4m to 1.5 m, due to cost considerations, the method of digging down to the rock layer is not used in the non-holding position, so most of the sand layer is retained, but it is difficult to construct the anti-floating anchor on the sand layer in the conventional way.
[0078] 2 Construction situation
[00...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com