Horizontal grouting construction method under closed environment
A closed environment and construction method technology, applied in underground chambers, earthwork drilling, wellbore lining, etc., can solve the problems of unreachable grouting reinforcement soil, hidden safety hazards of surface buildings, and poor stability of the tunnel face, etc., to achieve The construction method is safe, the operability is strong, and the construction method is simple and convenient.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0036] Main process parameters
[0037] ① Orifice tube: outer diameter Φ108mm, wall thickness 3.5mm, length 1.2m;
[0039] ③Aperture: 70mm;
[0040] ④ Diffusion radius: 1.3m;
[0041] ⑤Single hole grouting volume: estimated according to 15% porosity, the specific quantity is determined on site;
[0042] ⑥Initial setting time: 3h-5h for single liquid slurry, 1min-1.5min for double liquid slurry;
[0043] ⑦Final pressure of grouting: 0.3-2MPa is planned, adjusted according to on-site monitoring;
[0044] ⑧ Grouting termination conditions: double control of pressure and grouting volume.
[0045] ⑨ Grouting speed: slow speed, the slurry is fully diffused
[0046] (1) Orifice pipe installation
[0047] Before drilling, calculate the drilling vertical angle (slope) and horizontal angle (azimuth) according to the starting and ending coordinates of the grouting hole, and adjust it at any time during construction according to the calculation resul...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


