A Reconfiguration Method of Ship Power Distribution Network Based on Queue Intelligent Algorithm
A power distribution network and intelligent algorithm technology, which is applied in the direction of AC network circuits, electrical components, circuit devices, etc., can solve the problems of slow power supply recovery and large amount of calculation, so as to improve speed and efficiency, improve search accuracy, and reduce power distribution. The full effect of the construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0046] Specific implementation mode one: what this implementation mode records is a kind of reconstruction method of the ship power distribution network based on queue intelligent algorithm, and the concrete steps of described method are as follows:
[0047] Step 1: According to different ship types and power distribution networks, graph the power distribution network of the ship; determine the circuit structure used for the power distribution network of the ship's integrated electric propulsion system: the MVDC power distribution structure of the medium-voltage DC integrated power system is as follows: figure 2 As shown (for the convenience of description, the converter and inverter links are omitted), including 2 main gas turbine generator sets (MTG1, MTG2), 2 auxiliary gas turbine generator sets (ATG1, ATG2), 6 main power distribution boards (Bus1, Bus2, Bus3, Bus5, Bus6 and Bus7), 2 tie bars (Bus4 and Bus8), 3 area load distribution boards (Bus9, Bus10 and Bus11), 2 propul...
Embodiment 1
[0081] Figure 4 It is an example of the structure of the ship's MVDC integrated electric propulsion system before failure. The power of each generator and load is shown in the figure, and the failure occurs in each protection area.
[0082] Figure 5 It is a graphical representation of a fault example of a ship MVDC integrated electric propulsion system. The failure of the regional bus connected to the generator is one of the most likely to cause insufficient power in the system. Assume that the bus Bus1 connected to MTG1 fails. In order to isolate the fault, circuit breakers BK1 and BK10 , BK17 and BK18 must be disconnected. Graphical representation of the system at this time such as Figure 5 As shown, the black dotted path indicates that the circuit breaker cannot be used for reconfiguration operations.
[0083] Figure 6 In order to realize the fault instance reconstruction results of ship power distribution network reconfiguration based on the queue intelligent algor...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



